Laserfiche WebLink
R. TRENT EBERSOLE, P.E. <br /> SENIOR PROFESSIONAL & QA/QC <br /> 1-95 PD&E STUDY PROJECT"TRAFFIC FORECASTING,FDOT DISTRICT FOUR,FORT LAUDERDALE,FL <br /> Senior Project Manager: Responsible for directing and overseeing the staff in development of traffic forecasting analyses for this <br /> Istudy, which considered the construction of Interstate 95, to be a six-lane expressway in Saint Lucie and Indian River Counties: The'_ <br /> project limits extend south of SR-70/Okeechobee Road to north of CR-512/Fellsmere Road. Other responsiblities included evaluating.`: <br /> the different alternatives, which were proposed that included a new interchange at CR-606/Oslo Road in Indian River County: =The <br /> Iproject traffic was forecast, based on the Treasure Coast Regional Planning Model (TCRPM), historical trends, and Traffic Analysis <br /> Zone (TAZ)zonal data information, and for the horizon periods of: year 2005, opening year 2015, interim year 2025 and design.year ' <br /> of 2035. <br /> ICLEVELAND AVENUE REDEVELOPMENT STUDY,DOII;\TOUV FORT MYERS REDEI'£LOPMETTAUTHOR/T); FORT MYERS,FL <br /> Senior Project Manager: Responsible for overseeing and QA/QC of the preparation of the traffic analyses, as a subconsultant, to <br /> determine the traffic impacts of the redevelopment Master Plan for this U.S. highway. Duties also included evaluating and providing <br /> IQA/QC and analyzing the existing land use data and proposed land use alternatives, and coordination with the partnering land use <br /> planning firm. In addition to traffic impacts, safety enhancements were recommended, such as the conversion of the center undivided <br /> two-way left-turn lane to a raised median, and controlled turning movement pattern. Mr. Ebersole also reviewed and provided QA/QC <br /> of the traffic circulation study, due to the planned installation of the median, as traffic could be diverted to the adjacent neighboring <br /> Istreets. A Master Plan was prepared for four (4) alternatives to determine constructability, as this was a pilot program supported by <br /> the Downtown Fort Myers Redevelopment Authority, and included special designated land uses to create a medical office corridor, <br /> which supported the Lee Memorial Hospital and was a context-sensitive access management design, adopted by the FDOT, as a safety <br /> corridor improvement/enhancement project. <br /> I <br /> CI'T'Y OF WEST PALM BEACH TRANSPORTATION CONSULTANT,CITY OF I PEST PALM BEACH,WEST PALM BEACH, FL <br /> I <br /> Project Manager: As the City Traffic Engineer/Consultant and Contract Liaison, responsible for performing various traffic operations <br /> and planning projects. Traffic operations projects included signalized intersection qualitative assessments, one-way street circulation <br /> evaluation, traffic data collection, and pedestrian crossing assessments and maintenance of traffic plans preparation. Planning <br /> elements of the contract included the preparation of traffic concurrency impact studies for various sites and an update of the City's <br /> Transportation Element of the Comprehensive Plan. <br /> I <br /> FORT MYERS CITYWIDE PARKING STUDY,CITY OF FORT MYERS,FORT MYERS, FL <br /> I <br /> Senior Project Manager: Responsible for overseeing the development of the parking study/report, which included identifying the <br /> optimum locations for new parking facilities and opportunities to improve or increase existing parking supplies, within the entire <br /> downtown area. Other responsibilities included assessing traffic performance measures for: transit availability and pedestrian/bicycle <br /> connectivity to preferred parking facility sites. <br /> CITY OF FORT MYERS HARBORSIDE CONVENTION CENTER,CITY OF FORT MYERS, FORT MYERS,FL <br /> I <br /> Project Manager: Responsible for overseeing and directing the staff in the development of the transportation planning services for the <br /> proposed relocation of a 3,000 employee textile/women's apparel manufacturing headquarters, at the City's Downtown Convention <br /> ICenter. The study included traffic capacity and parking impact analyses of the new, approximately 115,000 square foot office <br /> building, parking requirements on the first floor, including mixed-use attributes of the office building combined with an existing <br /> convention center. The City's recently adopted redevelopment plan with "smart code"requirements guided the analysis. <br /> ICOMPREHENSIVE PLAN UPDATE,MART/N COUNTY,MARTIN COUNTY,FL <br /> Project Manager: Responsible for providing updates to the transportation element of the comprehensive plan. The updates included <br /> an addendum to incorporate a substantial annexation area with a pending Development of Regional Impact(DRI). <br /> COMPREHENSIVE PLAN UPDATE,CITY OF PORTST LUCIE,PORT ST.LUCIE,FL <br /> Project Manager: Responsible for providing the update to the transportation element of the comprehensive plan. The updates <br /> included an addendum to incorporate a substantial annexation area with a pending Development of Regional Impact(DRI). <br /> I <br /> McMAHONCITY OF SUNNY ISLES BEACH <br />