Laserfiche WebLink
i <br /> Craven Thompson and Associates,Inc. MEM WOM"° <br /> 3563 NW 53rd Street <br /> Fort Lauderdale,FL 33309 <br /> ADOLFO A GONZALEZ, P.E., LEED®AP 954.739.6400 <br /> www.crayenthompson.com <br /> ADOLFO A. GONZALEZ, P.E., LEED AP, Project Manager <br /> BACKGROUND <br /> Mr. Gonzalez has over twenty-six years civil engineering experience in site <br /> development, master planning, project feasibility studies, surface water <br /> management, water resources engineering, utilities engineering, transportation <br /> Gengineering, plans production, specifications preparation, environmental <br /> • permitting, bidding, contract administration, inspections, project management, <br /> ✓ oral and written proposal presentations, and client service management. His <br /> QUALIFICATIONS experience includes: establishing a public infrastructure business unit for <br /> Years of Experience WilsonMiller, an ENR Top 500 firm; and working with the Collier County Office of <br /> With CTA-4 Capital Projects Management as the Capital Projects Director, where he directed a <br /> With other firms: 22 multi-year, $300,000,000+infrastructure improvement program. <br /> City of Residence: Senior Supervising Engineer - (2008 - Present) Craven Thompson & Associates, <br /> Miramar, Florida Fort Lauderdale <br /> Affiliations Calder Casino, Miami Gardens, Florida - Civil Engineer Project Manager/ Engineer <br /> Florida Engineering of Record. Construct 110,000 SF building at an existing site. Challenges included <br /> Society(FES),Vice coordinating an off-site water main extension through WASD and creating a <br /> President, FES Calusa separate storm water management system for new building and parking lots <br /> Chapter, 2005-2006 without impacting existing drainage facilities. <br /> Secretary, FES,Calusa Children's Reading Center and Museum, Davie - Civil Engineer Project Manager/ <br /> Chapter, 2005-2006 Engineer of Record. Construct new 68,461 SF building designed for a LEED Gold <br /> Treasurer, FES, Calusa rating. Challenges included maximizing site layout while avoiding wide existing <br /> Chapter, 2004-2005 easements, coordinating off-site driveway connections with Town of Davie, and <br /> National Society of securing variances from the Central Broward Water Control District. <br /> Professional Engineers Collier CountyNorth Regional Library, Collier <br /> Florida Institute of g County- site civil task manager and <br /> record engineer responsible for site design, plans preparation, and permitting. <br /> Consulting Engineers, <br /> Chairman, Professional North Naples Government Services Building, Collier County - site civil task <br /> Practices Committee, manager and record engineer responsible for the site design and permitting of a <br /> 2003-2005 12,000 sq.ft. building addition at the North Naples Regional Library 8.5 acre site. <br /> Education Spangler Boulevard, Port Everglades- Civil Engineer Project Manager/ Engineer of <br /> Georgia Institute of Record. Construct a realignment of the existing 4 lane divided roadway with <br /> Technology, Bachelor of security barrier to provide a secured roadway inside Port Everglades. The project <br /> Science, includes traffic impact studies, new security checkpoints, street lighting, relocation <br /> Civil Engineering(1985) of dynamic message signs, Sallyport,and security screening on the garage. <br /> Registration McIntosh Road, Port Everglades - Civil Engineer Project Manager / Engineer of <br /> Professional Engineer- Record. Construct expansion of existing 4 lane divided road to 6-8 lane divided <br /> FL No. 42577 (1990) road with dedicated storage lanes for individual container yard. <br /> Stranahan High School, Phased Replacement, Fort Lauderdale - Civil Engineer <br /> LEED Accredited r <br /> Project Manager/Engineer of Record. Construct new 246,000 SF high school <br /> Professional, United complex in 4 phases while maintaining existing school campus operation until last <br /> States Greenbuild phase. Provided civil engineering design and LEED site planning to architect. <br /> Council, 2009 Challenges included keeping existing water/sewer/drainage infrastructure <br /> operational while constructing new facilities. 'The project was deferred <br /> indefinitely by Broward County School Board at the 50% CD stage due to funding <br /> constraints. <br /> City of Sunny Isles Beach I Request for Proposal No. 12-04-02 54 <br />