Laserfiche WebLink
Craven Thompson and Associates,Inc. W° I <br /> 3563 NW 53rd Street 1 g 1 <br /> Fort Lauderdale,FL 33309 <br /> DAMIAN CARTWRIGHT, P.E. 954.739.6400 IC <br /> www.craventhompson.com j <br /> ' DAMIAN CARTWRIGHT, P.E., Senior Engineer <br /> BACKGROUND <br /> a <br /> ,�_ Mr. Cartwright has over twelve years of experience providing project <br /> `--'y'Y management, design and construction management services for a host of public <br /> �,� /' sector clients including schools, universities, airports, utility agencies, park <br /> departments, and numerous other entities. These services include the design of <br /> , .I potable water and fire protection distribution systems, sanitary sewer collection & <br /> 1111 / transmission systems, storm water management systems, preparation of contract <br /> QUALIFICATIONS documents and specifications, and construction inspections. Mr. Cartwright has <br /> been with Craven Thompson &Associates, Inc. since 2007. <br /> Years of Experience <br /> With CTA- 5 Senior Engineer(Sept. 2007 -Present) -Craven Thompson &Assoc. - Fort Laud. <br /> With other firms- 7 N.E. 5`h Avenue Roadway Reconstruction Project - Engineer of Record responsible <br /> for the provision of professional engineering services for the designing, permitting <br /> Registration and construction management of approximately 0.60 miles of roadway <br /> Professional Engineer, reconstruction improvements. The civil engineering services included: full <br /> Florida No. 63056 roadway reconstruction design per FDOT plans preparation standards, stormwater <br /> (2005) management ADICPR modeling and design, utility coordination and relocation, all <br /> associated jurisdictional permitting, and construction management. <br /> Education <br /> University of Florida, NE 38th St. Roadway Reconstruction Project- Engineer of Record responsible for <br /> Gainesville, Florida the provision of professional engineering services for the designing, permitting and <br /> Bachelor of Science in construction management of approx. 0.90 miles of roadway reconstruction <br /> Civil Engineering with improvements. The civil engineering services included: full roadway reconstruction <br /> Honors(2000) design per FDOT plans preparation standards, stormwater management ADICPR <br /> modeling & design, utility coordination, and all associated jurisdictional permitting. <br /> • City of Miami Gardens Livable Neighborhoods Improvements Project-Project <br /> Engineer responsible for the provision of professional civil engineering services for <br /> the design and permitting of drainage, lighting and streetscape improvements for <br /> three neighborhoods totaling approximately 222 acres within the City of Miami <br /> Gardens, Florida. Project involves extensive storm water modeling utilizing AdICPR <br /> software, community involvement presentations, and the development of <br /> construction drawings and specifications. <br /> Opa Locka Airport, Opa Locka, Florida -Project Engineer - Estimated Cost $13 <br /> Million (only infrastructure), 220-Acre development at Opa Locka Airport. The <br /> large scale project included the design of the backbone infrastructure (water, <br /> sewer, drainage) to serve future developments at the Airport. The detailed design <br /> included two pump stations and well, as well as an extensive water distribution <br /> network and storm drainage system. <br /> NW 21st Avenue Improvements (From NW 19`h Street to Oakland Park Blvd.) - <br /> Project Engineer responsible for the provision of professional civil engineering <br /> services for the design and permitting of approximately 2400 linear feet of 8-inch <br /> potable water main. Additional responsibilities include assisting in the completion <br /> of the drainage design and permitting, and the resolution of potential conflicts <br /> between existing utilities and the proposed potable water and drainage system. <br /> City of Sunny Isles Beach I Request for Proposal No. 12-04-02 /55 <br />