Laserfiche WebLink
RESUME <br /> Horatio A. Rodriguez, PE <br /> Principal /Vice President l <br /> Senior Mechanical Engineer • kTm• • t, <br /> Mr. Rodriguez has substantial experience in Heating, Ventilating and Air ,„„2' 4 4 <br /> Conditioning Systems for Medical Facilities, Residential, Commercial and � <br /> Industrial Projects. Designs include Chiller Plants, Indoor Pool De-Humidification <br /> Systems; IAQ Inspections, Constant and Variable Volume Air Conditioning <br /> 1 i <br /> Systems; Industrial Ventilation; Life Cycle Cost Analysis; Chilled Water, DX <br /> Systems; Smoke Control. <br /> SELECTED PROJECT EXPERIENCE Years of Experience: <br /> 31+ <br /> Multi-Purpose Municipal Parking Facility <br /> Miami Beach, Florida <br /> JALRW provided Electrical, HVAC, Plumbing and Fire Protection Engineering Education: <br /> Design for this 300,000 square foot, 6-level, 550 parking space parking garage Florida International <br /> that includes a 35,000 square foot 5-story office liner. Mr. Rodriguez was the University,Mechanical <br /> Mechanical Engineer of Record for the HVAC Systems design. Construction costs Engineering <br /> excluding tenant improvements: $15,300,000. Miami-Dade Community <br /> Memorial Hospital Parking Garage College—Associates in <br /> Broward County, Florida Arts-Engineering,1986 <br /> JALRW provided the Mechanical Ventilation, Lighting, Power Distribution and <br /> Drainage for this Six Story Parking Garage which has provisions for 1,458 Parking Registration <br /> Spaces. This Garage also has an Air Conditioned Office and Restroom Facilities, Professional Engineer <br /> for which we provided the Engineering Design. Mr. Rodriguez was the State of Florida- <br /> Mechanical Engineer of Record for this project. Construction Costs: $10,000,000. 456198 <br /> Vista Center-Municipal Office Building <br /> Palm Beach County, Florida <br /> JALRW provided Mechanical and Electrical Engineering Services, including Tenant <br /> Fit out of Office Spaces for this new facility for Palm Beach County. This 251,000 <br /> square foot, multi-level office building, with a 900-car parking structure, is <br /> located on Vista Parkway. Design includes 24-Hour HVAC Systems for Computer <br /> Rooms, utility provisions for a Kitchen and Cafeteria, designed by the Kitchen <br /> Consultant. Mr. Rodriguez was the Mechanical Engineer of Record for this project <br /> Construction Costs: $30,000,000. <br /> South Regional/Broward College Library <br /> Pembroke Pines, Florida <br /> JALRW provided HVAC and Electrical Engineering Design Services for this new <br /> 70,000 square foot regional library project on Broward Community College's <br /> south campus. The library is provided with daylight controls and energy efficient <br /> dimmable lighting, CO2 sensors, demand control ventilation, dedicated outside <br /> City of Sunny Isles Beach I Request for Proposal No. 12-04-02 60 <br /> ASI <br />