My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Atkins - Civil
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Atkins
>
Atkins - Civil
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 1:53:19 PM
Creation date
2/5/2016 11:05:20 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICivil/Environmental Engineering 13-2 <br /> I <br /> I <br /> 1 Staff availability <br /> The availability of the Atkins team members are shown in the assure necessary capacity. We have the depth of resources <br /> i table below. All staff members have sufficient available time within our core management team to enable us to provide the <br /> to complete tasks in a timely, cost-effective manner, while appropriate technical resources in a cost-effective, expeditious <br /> maintaining quality standards for the duration of a project. manner, as well as to draw upon staff with required expertise <br /> Q To further ensure delivery, our team will continually monitor n a rapid fashion. Atkins is committed to the City of Sunny <br /> and project the workload of our technical staff to proactively iIsles Beach to assign personnel as needed. <br /> IProposed Staff Project Role Percent <br /> Availability <br /> 1 Larry Levis, AIA, NCARB Principal-in-Charge 35% <br /> Victor Hererra, PE Team Project Manager and Project 80% <br /> Programming <br /> IJohn Wilt, PE, LEED GA Quality Assurance/Quality Control 50% <br /> Mariger Figueroa, PE Drainage System Designs 60% <br /> I Werner Reinefeld, PE Sanitary and Storm Pump Station 70% <br /> Evaluation/Design and Force Main Analysis <br /> W. Mark Henry Environmental Assessments 60% <br /> 1 Jose Lopez, PE, PMP Project Programming 60% <br /> Jeremy Bourdon, PE Roadway Design 60% <br /> I. Ricardo Castro, PE Roadway Design 50% <br /> Victor Herrera's professional license <br /> ,tttttof xg� <br /> 511E <br /> et <br /> I a st o. <br /> !anr� af� ufesstatta� n$ineers <br /> 1'' 0.,' - --.-z1 <br /> Victorti. errera, P.E. . <br /> I ,- - _:4: <br /> Con .ESN <br /> IS LICENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471,FLORIDA STATUTES <br /> EXPIRATION:2128@013 P.E..Uc.No: <br /> iAUDIT No: 228201326033 71164 <br /> I <br /> 1 0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ Na 12-04-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.