|
Architecture I 3-8
<br /> 1
<br /> 1
<br /> Gary Wingo, RA, LEED AP World Trade Center T Stop-Silver Line, Boston, MA. Project coordinator responsible for
<br /> BD+C design development through construction documents and detailed exterior/interior design for
<br /> Quality Assurance/ this $26 million intermodal/bus transfer facility.
<br /> Quality Control D019B Satellite Maintenance Facility/Emergency Response Station 10 , Boston, MA.
<br /> Project coordinator responsible for providing construction document detail support and 3-D
<br /> modeling and rendering.
<br /> Veteran's Affairs Ambulatory Care Center, Boston, MA.Job captain for three separate
<br /> design development phases for this $48 million, 186,000-square-foot project including multiple
<br /> surgical suites, patient rooms, offices, and traditional support spaces.
<br /> Multiple Miscellaneous Health and Rehabilitation Centers Renovations, Central and
<br /> South Florida. Architectural consultant responsible for preparing construction documents,
<br /> details, and production support for various healthcare renovation projects in Miami, Ocala, St.
<br /> Petersburg, and Gainesville, Florida.
<br /> Project 777 Theme Park/Warner Brothers Entertainment, Inc., Abu Dhabi, United Arab
<br /> Emirates(Aldar Properties PJSC). Senior project architect on one of four neighborhoods
<br /> for this large, overseas theme park project where he is responsible for interpreting, organizing,
<br /> executing, and coordinating neighborhood project assignments and deliverables for schematic
<br /> design and design development phases. This project involves architectural, engineering, and
<br /> construction administration services for the development of a new Warner Bros. theme park
<br /> in Abu Dhabi. This complex multi-attraction area of the theme park "neighborhood" includes
<br /> over two dozen unique facilities such as ride buildings, open area entertainment attractions, an
<br /> amphitheatre, retail and dining facilities, business offices, a child care facility, and miscellaneous
<br /> guest and staff support spaces.
<br /> Royal Park Complex, Almaty, Kazakhstan.Architectural consultant responsible for
<br /> organizing, coordinating, and producing schematic design and design development documents.
<br /> This $500 million project involved development of a 175,000-m2 (Autodesk-based design) mid-
<br /> i density luxury residential complex including 14 residential buildings, clubhouse/spa building,
<br /> multiple underground parking garages, and expansive custom site amenities.
<br /> Fairfield Resorts at Bonnet Creek, Orlando, FL. Project architect responsible for preparing
<br /> multiple exterior construction document details for Phase 2, guest buildings 2 and 3.
<br /> Heiman Hurley Charvat Peacock Architects, Inc. (HHCP) Main Office Building
<br /> Renovations, Maitland, FL. Project architect responsible for preparing construction
<br /> documents detailing demolition and new work associated with repairing, renovating, and
<br /> upgrading existing headquarters following significant hurricane damage in 2004.
<br /> Prince William County Public Schools Systemwide Analysis Reports, Manassas,
<br /> VA. Designer responsible for managing an eight-member survey team and creating survey
<br /> criteria, forms, and database report format for two facility analysis report phases involving 33
<br /> elementary, middle, and high schools.
<br /> Burleigh Manor Middle School, Ellicott City, MD. Designer responsible for designing
<br /> railings, bulkheads, stage, and numerous student street details for this $9.2 million,
<br /> 102,700-square-foot middle school.
<br /> I
<br /> 1
<br /> 0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02
<br />
|