Laserfiche WebLink
C <br /> ® . ti 1st <br /> o , . SGM Engineering, Inc. <br /> I� + City of Sunny Isles Beach RFP No. 12-04-02 <br /> ° (•., } Continuing Professional Architectural & Engineering Services <br /> -,;� ;.'� Firms Only (CCNA) <br /> O <br /> '!4,.O.r`°I •p Section 3 - Staffing <br /> ® Mr. Escott is skilled in the design of electrical systems including, but not limited to, fire alarm and detection <br /> ® systems, medium and low voltage AC power systems, Electronic Security Systems (ESS), uninterruptible power <br /> systems, computer power conditioning, grounding, lightning protection, lighting control systems, emergency <br /> O power, hazardous area electrical installations, control and monitoring systems, cable tray systems, <br /> ® communications raceway systems, and communications premise wiring. <br /> ® Both Mr. Lizasoain and Mr. Escott are successful Project Managers as they have demonstrated to simultaneously <br /> manage the four basic elements of a project including resources, time, money, and most importantly, scope. All <br /> o these elements are interrelated. Each must be managed effectively. Our Project Managers manages these <br /> ® elements together making the project and the project manager a success. Our Project Managers understand the <br /> project management process includes but is not limited to first agreeing the complete accurate specifications for <br /> ° the project , Plan the project considering factors such as time, team, activities, resources, financials using SGM's <br /> project management software and support, Communicate the project plan to the project team and owner, <br /> ® delegate project actions based on the strengths of individuals, <br /> ® manage and motivate staff by informing, encouraging, enabling the entire project team, Quality Assurance and <br /> 0 Checks to measure, monitor, review project progress communicating the project team and others, and <br /> successfully complete project concluding a review and report on project performance. <br /> ® Mr. Lizasoain and Mr. Escott's commissioning backgrounds include high containment facilities which include <br /> many potential risks associated with translating the design intent into the completed facility. In addition, Our <br /> o Project Managers ensure that both commissioning and validation are important tasks as these activities minimize <br /> ® the risk of subsequent rework and building alterations, which can be both costly and disruptive to the program of <br /> work. Our Project Managers experience is in commissioning for building envelopes, thermal barrier to provide <br /> ® insulating properties, a vapor barrier to prevent the diffusion of moisture through the building, drainage planes to <br /> effectively manage water infiltration, and an air barrier to control the movement of air across the building <br /> ° envelope. Satisfying these requirements led to significant changes in building envelope construction. <br /> O SGM Project Managers will ensure: <br /> ® • Provide daily communication between City and the project team <br /> ® • Coordinate, manage and execute concurrent project tasks <br /> • Perform QA/QC with at the various design stages <br /> • Develop design schemes <br /> • Coordinate with Key personnel <br /> ® • Pool Project Resource Professionals <br /> O Project Resource Professionals <br /> ® • Perform site visits to verify existing conditions <br /> ° • Perform energy model simulation <br /> • Perform life cycle cost analysis <br /> 0 • Provide insight/recommendations drawn on past experience to the Project Manager <br /> ® • Assist in the overall design effort <br /> • Assist in bidding and contractor selection <br /> ° • Conduct Construction Administration <br /> ® Size of Firm <br /> ® SGM has 26 staff-members in all disciplines available to perform job assignments. The staff committed to this <br /> contract will be immediately available for your projects and the depth of staff will provide support when necessary <br /> ® to handle multiple projects concurrently. SGM's Key Personnel can be onsite the next business day after <br /> ® receiving notice from the City. <br /> ° <br /> ° <br /> o SGMA <br /> ® ENGINEERING <br /> w arvunn.0 i.c,.uu 25 <br /> 0 <br />