Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> Lazaro Alvarez, RA <br /> • Job Captain, Senior Associate <br /> • <br /> • Professional Design Experience <br /> • Lazaro Alvarez has a record of accomplishment in architectural design and construction of a wide <br /> variety of multifaceted projects,including major cruise terminal structures,hospitality,residential and <br /> • <br /> , • multiuse/commercial facilities and components.Mr.Alvarez successfully integrates various forms of <br /> • `J:`;SI transportation,terminal operations,concession spaces or other uses.He manages multi-disciplinary <br /> • 1k�` '�/ project teams and subconsultants,and is involved in construction documentation and supervision. <br /> • <br /> • _ /\ PROJECT EXPERIENCE <br /> • / — Port of Miami, Cruise Terminals 'D' and 'E', Miami, Florida - Architect/Job Captain. A/E, planning. <br /> • design and post design services for the repairs,upgrades and new construction for Cruise Terminals <br /> 'D'and'E'.Project includes upgrades/new construction for the building envelope systems(including <br /> • <br /> roofing);horizontal and vertical circulation;connecting passenger boarding bridges(PBB),landside <br /> • and waterside site development; wharf and berthing improvements; wharf access; intermodal <br /> • areas; ancillary roadways; parking facilities; provisioning facilities; comfort stations and increasing <br /> EDUCATION restroom level of services; canopies: wayfinding; life safety; ADA accessibility; operational and <br /> • Bachelor of Architecture, security enhancements including checkpoints;access control;furniture;fixtures:equipment;and all <br /> • University of Miami,2001 related infrastructure,building and structure work.Mr.Alvarez is involved in the design including LEED <br /> • certification, construction documents. permitting, commissioning and construction administration. <br /> • REGISTRATION This project is a fast track project. <br /> Registered Architect,State of <br /> • Florida.AR94914 Port of Miami, C3 Building, Miami, Florida - Aided in the design and development of construction <br /> • documentation including coordination with the various consultants for a new communications, <br /> Certified Fire Safety Inspector, <br /> • State of Florida,2002 command,and control facility for the Port of Miami. <br /> • Port Everglades. Terminal 26/27, Fort Lauderdale, Florida - Responsible for the development of <br /> • construction documents. Project entailed the redesign of an existing warehouse facility to be <br /> • converted into a passenger cruise terminal. <br /> • Port Everglades, Terminal 2, Fort Lauderdale, Florida - Responsible for the overall design and <br /> • development of construction documents including coordination with the various consultants.Project <br /> • entailed improvements including the addition of an elevator and the upgrade of existing finishes. <br /> • Improvements were also initiated to an adjacently attached warehouse facility to be converted <br /> • into a new baggage area,which included restroom facilities and U.S.Customs offices. <br /> • Port Everglades, Public Works Facility, Fort Lauderdale, Florida - Responsible for the overall design <br /> • and development of construction documents including coordination with the various consultants. <br /> • Entailed alterations to an existing maintenance facility and the design of a new expansion facility <br /> for Public Works. <br /> • <br /> • Port Everglades, Northport Parking Garage, Fort Lauderdale, Florida - Prepared documentation for <br /> • general maintenance,repairs and improvements to the existing parking garage facility. <br /> • Port Everglades,S.O.C. Building,Fort Lauderdale, Florida-Aided in the development of construction <br /> • documentation including coordination with the various consultants. <br /> • <br /> Port Everglades, Building 28, Fort Lauderdale, Florida - Working along with structural engineers to <br /> • determine overall structural integrity of an existing repair warehouse structure. <br /> • <br /> • Port Everglades, Terminal 29. Fort Lauderdale, Florida - Responsible for the overall design and <br /> • development of construction documents including coordination with the various consultants. <br /> • Project entailed improvements to the existing passenger terminal facility as well as the conversion <br /> of an adjacent warehouse facility to a new baggage area, including new restroom facilities and <br /> • finishes to match. <br /> Cba D www.bermelloajamil.com <br /> • <br /> • 42 <br /> A <br />