Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> O <br /> • <br /> • Freddy Vivas <br /> • Designer, Senior Associate <br /> • <br /> • Professional Experience <br /> it with over 8 years of experience, Mr. Vivos brings a wide variety of knowledge to each project. <br /> His projects range from Residential. Commercial and Municipal Buildings to Master Plans of large <br /> • building ensembles. He encompasses every aspect of design, from code research and master <br /> • !Jill! planning to final design and construction documents. <br /> 1 <br /> • <br /> • 4PROJECT EXPERIENCE <br /> • <br /> �,: f• • Morgan Levy Park 8 Community Center (formerly Doral Park), Doral, Florida - Designer for this <br /> • ty' ;_ •, AP"n� development consisting of the design of 3 distinct schemes representing the renovation of a 14-acre <br /> • neighborhood park.The design incorporated active and passive recreation facilities,working within <br /> the confines of the existing site layout, which included tennis courts, a recreation building and a <br /> • <br /> parking lot. Responsibilities included overseeing all phases of the project, from initial programming <br /> • and architectural design to construction documentation and administration. <br /> • EDUCATION Joseph Caleb Center New Courthouse Annex/Additions and New Parking Garage,Miami, Florida- <br /> • Master of Architecture. Designer for this LEED project. Services were to identified green building strategies for Miami Dade <br /> Suburb and Town Design <br /> • University of Miami,Florida, County's new two-story Courthouse, three story parking garage and retail located at the Caleb <br /> • 2003 Community Center- seeking Silver certification at a minimum under the Leadership in Energy and <br /> • Environmental Design (LEEDS) Green Building Rating System of the U.S. Green Building Council <br /> Bachelor of Architecture, New Construction Version 2.2. Conducting LEED feasibility report analysis during schematic design, <br /> • Universidad Central de and organized charette sessions for the team through out the life of the project.The new two story <br /> • Venezuela,2000 courthouse has approximately 25,000 SF of public, semi-public spaces and private.The three story <br /> • garage is housing 488 vehicles and an energy-star compliant roofing coupled with a green roof to <br /> reduce temperatures around the building as well as contribution to the urban heat island effect. <br /> • Project has been registered through the US Green Building Council.Currently tracking possible LEED <br /> • credits the team can try to achieve. <br /> • Coral Gables Museum Garage,Coral Gables,Florida-Designer for this 8-stay parking garage that would <br /> • support more than 600 spaces.and provide for retail space along the ground floor on an adjacent street. <br /> • Alcazar Parking Garage, Coral Gables, Florida - Design for this parking garage development <br /> • which called for the design of approximately 900 new parking spaces to support future community <br /> • growth.The parking garage was designed to meet the objectives brought forth during a charrette <br /> involving the designers and members of the community. <br /> • <br /> • Palmetto Bay City Hall/Perrine Park/Police Department & Public Works Study, Village of Palmetto <br /> • Bay, Florida-Project Designer for a preliminary needs assessment study.The vernacular style of the <br /> building relates to the surrounding area where the facility is located.The two story mass is celebrated <br /> • with a four story tower which is crowned with a look out terrace.The tower becomes an icon which <br /> • will be seen by drivers and pedestrians and will announce the sense of arrival to the building. <br /> • Arcades and internal patios bring the tropical theme to the 25.000 s.f. facility, which will contain <br /> offices and the council chamber.The building is strategically located at the east side of the park. <br /> • towards SW 164 because of its proximity to a future parking structure and fleet maintenance facility <br /> • located across the street.This parking will satisfies the requirements for the Police station and the City <br /> • Holl. After further studies this location was discarded due to unsuccessful attempts by the Village to <br /> • secure the additional properties. <br /> • South Miami Hospital Clinical Expansion, South Miami, Florida-Designer.The Clinical Expansion is a <br /> • key component of the South Miami Hospital Expansion program. With a budget of approximately <br /> • $58 Million,the project consists of the design of 91,000 additional SF of floor area and the renovation <br /> of 67,000 existent SF. The expansion will provide 16 acute care treatment spaces, a 6 station Fast- <br /> • Track, and a 12 bed Clinical Decision Unit. The second floor surgery department will provide 16 <br /> • new operating rooms in which four of these rooms will be designed for robotic surgery.The project <br /> • Cba p www.bermelloojamil.com <br /> • <br /> • 44 <br />