My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil - Architecture
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Bermello Ajamil
>
Bermello Ajamil - Architecture
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 4:42:21 PM
Creation date
2/5/2016 4:40:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> Saul Suarez, RA <br /> • Quality Assurance & Quality Control <br /> • <br /> • 2300 Building. Pompano Beach, Florida-This retail/residential complex was fueled by a 30-year <br /> • personal friendship with the original developer that wonted to do something different at the <br /> time. This mix-use facilities with retail space on the ground level was residential rental apartments <br /> • on the second floor level was the first of its kind as part of the Pompano Beach re-development <br /> • zoning district. Mr. Suarez participated as the Design Architect and Project Manager all the <br /> • way through the project including all the tenant improvements and the interior design of a small <br /> restaurant at the East end of the facilities. This 28,000 sq.ft.retail/office space and 1 a rental units <br /> • <br /> cost $3.4 million to develop. <br /> • <br /> • Ramada Inn,Chattanooga,Tennessee-Project Manager for four-story.200-room hotel with restaurant <br /> • and conference center.This 92.000-sf project was built for$7.1 million, including interior finishes but <br /> excluding furniture. <br /> • <br /> • Plaza Hotel, Daytona Beach, Florida - Project Manoger for this multi-level and multi-functional <br /> • renovation and improvement: to revitalize the beach strip and old hotel, including public <br /> spaces, restaurants, corridors, party rooms, penthouse suites, pool terrace and entrance. <br /> • Construction documents included coordination of new A/C system and electrical wiring <br /> • upgrade. Budget was$8.2 million. <br /> • Pelican Pub Restaurant, Pompano Beach, Florida - Project Manager.responsible for site plan and <br /> construction management of unique restaurant. Over five years, converted an original marina/ <br /> • showroom and dry boat storage facility into a restaurant, going from wood deck-and-chickee- <br /> • roof patio bar to on 18,000-sf. full-service restaurant rated highly for food and atmosphere. <br /> • Construction was$2.5 million. <br /> • Pompano Fishing Pier,Pompano Beach,Florida-Architectural Designer.Site Planner and Project <br /> • Manager for combination fishing pier/retail/restaurant and public facility complex. This public/ <br /> • private development increased the project's scope and introduced a new concept.The project <br /> included a 6,500-sf restaurant.2.600-sf terrace and exterior 3,000-sf restrooms,5,000-sf retail shops <br /> • and 1,200-sf administrative offices. Construction value was$1.98 million. <br /> • <br /> • Pal's Cabin,West Orange,New Jersey-Co-Architectural Designer and Project Manager for intensive <br /> facelift of existing restaurant facilities that hod accumulated more than 50 years of sporadic <br /> • additions. The new building shell was designed and built over the original building. The original <br /> • building was dismantled in four days,and new interior was completed in two weeks.Construction <br /> • budget of$650,000 and the objective of restricting downtime to less than three weeks were met. <br /> • RETAIL EXPERIENCE <br /> • North Ridge Mall,Fort Lauderdale,Florida-Assistant Design Architect&Assistant Project Manager for <br /> • master plan development of project through bidding phase.Project was a retail strip store complex <br /> • that housed more than 150.000-sf of total construction, including two anchor tenants.This outdoor <br /> mall also included six mini-theaters and two out-parcels,for a gasoline station and a restaurant. <br /> • <br /> • Waterside Shoppes, Sunrise, Florida - Design Architect & Project Manager for master plan and site <br /> • plan development of a 30,000-sf retail strip shopping center for multipurpose use.Final uses included <br /> retail stores, animal clinic, two restaurants and an out-parcel, for a gasoline station. Client was a <br /> • <br /> private developer with investment of$1.8 million. <br /> • <br /> • Park City Plaza, Davie, Florida - Design Architect & Project Manager for master plan and site plan <br /> development for a 45.000-sf retail strip center. All interior improvements for 30,000 sf of individual <br /> • tenants, including two restaurants, physician offices, loundromat with heavy equipment and a <br /> • convenience store with gasoline pumps.Project development cost was$2 million. <br /> • <br /> • <br /> • <br /> Cba D www.bermelloajamil.com <br /> • <br /> • 54 <br /> m <br />
The URL can be used to link to this page
Your browser does not support the video tag.