Laserfiche WebLink
® ------ ---------------------- --- ----- - ------- -- Jason atson, P.E. -> <br /> Public Involvement/Compliance Review <br /> ® Relevant Experience <br /> ® General Traffic Engineering Consultant, West Palm Beach, FL— Has served I Special Qualifications <br /> ® as project engineer providing a variety of general traffic engineering services, • Has 16 years of experience <br /> including traffic modeling, streetscape alternatives, feasibility studies, traffic in traffic engineering and <br /> ® transportation planning, <br /> ® impact studies, and traffic access (including circulation and parking studies), development of regional <br /> as well as other miscellaneous transportation planning assignments. impact analysis and review, <br /> ® signal operations, traffic <br /> Dixie Highway/Olive Avenue Street Master Planning, West Palm Beach, impact analysis, and corridor <br /> ® FL—Assisted in determining lane geometries and turn-lane configurations for congestion management <br /> ® the conversion of Olive Avenue and Dixie Avenue for two-way traffic. Performed • Experienced in urban <br /> ® traffic simulation using Synchro and NETSIM for the Okeechobee Boulevard redevelopment, traffic calming, <br /> corridor to determine operational characteristics of two-way traffic on Olive and redesigning city streets <br /> 41 Avenue and Dixie Highway. to minimize adverse impacts <br /> of motorized vehicles and <br /> ® Traffic Impact Analyses, Palm Beach County, FL—Completed traffic impact accommodate bicycle and <br /> ® analyses for numerous residential and commercial developments countywide. pedestrian facilities <br /> • Vast knowledge in traffic signal <br /> ® Conducted traffic concurrency and transportation planning analysis using both timing optimization to increase <br /> 0 the old and the newly-adopted Transportation Performance Standards. capacity at intersections and <br /> corridors <br /> • Sebring Parkway Traffic Operations Analysis, Highlands County, FL • Proficient in Signal 2000, <br /> Prepared data collection and transportation corridor analysis during the Highway Capacity Software, <br /> ® planning stages of Sebring Parkway in Highlands County. The project involved CORSIM, Synchro/SimTraffic, <br /> • transportation modeling tasks, as well as traffic signal optimization. FSUTMS, and TRANPLAN <br /> I <br /> ® South Florida Intermodal Logistics Center, Palm Beach County, FL Professional Credentials <br /> ® Prepared transportation impact analyses considering truck and employee Master of Science, Civil <br /> Engineering, Georgia Institute of <br /> ® traffic operations for this proposed regional industrial project located south of Technology <br /> Lake Okeechobee. <br /> O Bachelor of Science, Civil and <br /> Okeechobee Boulevard/Lakeview Avenue Corridor Arterial Analyses, West Environmental Engineering, <br /> ® Palm Beach, FL— Performed arterial analyses using the Synchro/Simtraffic Tennessee Tech University <br /> ® traffic analysis and simulation tool for the City of West Palm Beach to assist in Professional Engineer in Florida <br /> geometric lane and signal timing recommendations. and Georgia <br /> e National Council of Examiners for <br /> ® Kings Highway Corridor Study, St. Lucie County, FL— Serving as project Engineering and Surveying <br /> Q engineer. Kimley-Horn is providing transportation planning services to evaluate FDOT Intermediate/Advanced <br /> short- and long-term corridor alternatives for Kings Highway in St. Lucie Travel Demand Modeling <br /> ® County. Workshops <br /> ® FDOT Fundamentals of FSUTMS <br /> Long Range Transportation Plan, Okeechobee County , FL—Transportation j Transit Modeling Workshop <br /> co consultant developing concurrency methodologies, traffic count databases, and FSUTMS Special Update <br /> ® and short- and long-range transportation plan updates. Our services include Workshop <br /> ® developing roadway alternatives that will allow the County to operate at their <br /> adopted level-of-service, as well as support the community's transportation Professional Organizations <br /> ® needs. This process involved developing an Okeechobee County American Council of Engineering <br /> Companies <br /> • transportation model (in conjunction with FDOT District One) to evaluate the <br /> efficiency and capacity of the different roadway alternatives. Florida Institute of Consulting <br /> • Engineers <br /> • Traffic Impact Analyses, St. Lucie County, FL— Served as project manager. Institute of Transportation <br /> Kimley-Horn completed traffic impact 'analyses for numerous residential Engineers <br /> ® <br /> PFO No.12-04-02rI=n Kimley-Horn <br /> IN300014.12o Sunny Isles ME Services resurnes.uWd \Mr , and Acsnriates.Inc. <br /> 3-26 <br />