Laserfiche WebLink
r <br /> Mike K1e,fer,. <br /> ') Utility/Environmental Permitting <br /> ; ) <br /> ® Representative Experience Special Qualifications <br /> 0 Oakland Park Environmental Services (Cherry Creek • Has 26 years of project experience and has <br /> ® Environmental Assessment and Dredging & Sleepy been responsible for more than 250 projects <br /> ® River Dredging), Oakland Park, FL— Kimley-Horn conducting environmental analyses, planning, <br /> ® has provided environmental services to the City of and design; environmental permitting; and <br /> Oakland Park as part of a continuing services contract. construction phase services <br /> ® Completed projects include: • Specializes in coastal land development and <br /> ® construction as well as waterfront land <br /> Cherry Creek Environmental Assessment and <br /> ® Dredging. Project manager responsible for • Experience includes both private- and public- <br /> ® environmental services, permitting, and construction sector projects such as the preparation of <br /> phase services consisting of an alternatives analysis NEPA documents and other engineering and <br /> ® and environmental assessment of Cherry Creek environmental documentation <br /> ® and Coral Lakes headwaters and preparing permit • Regularly involved in providing alternatives <br /> ® support documentation to dredge portions of the analyses as well as secondary and cumulative <br /> waterway and prepared the associated mitigation impact assessments, public interest evaluations, <br /> ® plans for the project. Coordination was initiated Use of State Lands approvals, assurance for <br /> • with all of the agencies having jurisdiction over antidegradation of water quality, and benthic <br /> the project including the South Florida Water studies (including seagrass assessments, <br /> • Management District, Broward County Department hydrographic studies, and threatened and <br /> ® of Environmental Resource Management, and endangered species coordination and monitoring) <br /> ® the U.S. Army Corps of Engineers. During the • Extensive knowledge of Florida's environmental <br /> ® permitting phase of the project, we conducted regulations and regulatory permitting programs <br /> wetland and seagrass surveys, designed a sampling including federal environmental regulations; has <br /> ® program, collected water quality samples, and established working relationships with numerous <br /> • interpreted the results. Because of the potential staff in regulatory agencies including FDEP <br /> for contaminants, the dredge spoil material was (Florida) FWC, USAGE, EPA, (U.S.) FWS, and <br /> ® collected and disposed of in a landfill as a "special NMFS <br /> ® waste." We also designed a water quality monitoring <br /> • plan for implementation during dredging, as well professional Credentials <br /> as a monitoring plan to ensure that the mitigation Bachelor of Science, Oceanographic Technology, <br /> ® achieves the success criteria for release from Florida Institute of Technology <br /> ® monitoring required by permit. KHA also provided Associate of Science, Computer Technology, Florida <br /> ® support during the bidding process, as well as Institute of Technology <br /> construction phase services during the duration of Hazardous Materials Health and Safety Certification, <br /> ® the contractor's work to maintain permit compliance. Occupational Safety and Health Administration <br /> ® Sleepy River Dredging. Project manager responsible Florida Chamber of Commerce, Environmental <br /> ® for environmental assessment and permitting Permitting <br /> ® services. KHA provided environmental services to PADI Divemaster <br /> assess potential project impacts including sediment <br /> ® and water quality sampling, habitat assessment, U.S. Army Corps of Engineers (USAGE) Certified <br /> ® shoreline condition assessment (wetland/riparian Wetland Delineation <br /> ® vegetation), and tidal and current measurement <br /> assessment. KHA also provided design guidance Professional Organizations <br /> O to another engineering firm to dredge portions of Marine Industries Association of Florida, Past <br /> ® the river to improve both tidal flow as well as rainfall President, Board of Directors, Government Affairs <br /> ® conveyance to the adjacent tidal waters. Services poor me Kimley-Horn <br /> also included permit support documentation to \m/ , and Associates,Inc. <br /> 0 IVO No.12-0=-02 3-33 <br /> 0Y2fi0315.12o Sunny Isles Ciel Emvorunental Erg Resumes.indd <br />