My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Assoc. - Environmental
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Kimley-Horn and Assoc.
>
Kimley-Horn and Assoc. - Environmental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 4:10:07 PM
Creation date
2/11/2016 4:10:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Professional Category: <br /> ® COt2tb�� _ —r <br /> �, @hj F= . . ,A� -gMeeing CI�1/IL/ IRONMEN'TAL <br /> ®l — = Petro Only : .r9 ENGINEERING REQ Na 1244-02 <br /> • <br /> • ■ Contract administration. <br /> • On-site observation. <br /> • • Certification that construction is complete and in compliance with the plans and specifications. <br /> • Deliverables in this phase include complete as-built record drawings and construction certification. While <br /> • these project milestones are the key steps in successful project completion, we believe the best-run projects <br /> are those with effective communication. We have accomplished this with the City by providing regular status <br /> • reports (with meetings, when desired) emphasizing thorough coordination and communication with the City. <br /> 0 <br /> • Quality Assurance/Quality Control (QA/QC) <br /> • Quality control begins with the team assigned to undertake this project. Recognizing the critical importance <br /> • of careful quality control, we have developed an extensive internal quality control program with a 200-page <br /> • manual to guide this process, which is routinely implemented on our projects. There will be no learning-curve <br /> impact on quality for the Kimley Horn team. <br /> • <br /> ® Our approach to frequent <br /> communication and to quality <br /> • assurance/quality control will relieve QA/QC Process for Deliverables <br /> • City staff of any significant project <br /> review efforts. A QA/QC review I'CO"y 1OWF <br /> • <br /> of project solutions and analysis, <br /> • together with design reviews, will <br /> • ensure a top quality deliverable for Inn T'a°O <br /> -4> <br /> the City. Our team's experience in IT•� Tame ® /% <br /> • coordinating and conducting public / <br /> ® meetings and information sessions <br /> /ACO• will also relieve staff of a considerable T� � / e .++e. <br /> burden. The ultimate goal of each kpled <br /> ; /ice b'OM. <br /> • project is to provide a safe and /' <br /> • satisfactory outcome for your citizens. m,;,,,,& +, <br /> Team Asdg.a I. ha®pm Guallty <br /> Assurance by <br /> • Our formal QA/QC program is based i �.:� NW. <br /> • upon assigning experienced senior i 2 <br /> I. <br /> w;amass <br /> megrim• professionals who are otherwise 11 <br /> qualified to manage a particular Prodbead <br /> • project, to serve in an independent 1 <br /> • quality control role. Bill Cary, P.E. will p.cipet +2 <br /> CMGmadolm <br /> serve as our DA/OC reviewer. Bill has seism <br /> • more than 35 years of engineering <br /> • experience and has provided QA/ <br /> • QC reviews on a wide range of <br /> ® projects. Our staffing depth allows us LTP=l..a i.nca Prcl.m W <br /> to provide such personnel, and their OCR-o.+n Cama revol er <br /> • involvement provides the project with <br /> • fresh perspective and critical eye. <br /> • <br /> REQ No.12-04-02 r M VI Kimley-Horn <br /> • OY260015.12o Sunny Isles Cad Emrironmental Eng.indd 1166.11111111r 1 and Assmiates,Inc. <br /> • 4-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.