Laserfiche WebLink
illustrate some portion of Work and all illustrations, brochures, standard schedules, performance <br /> charts, instructions, and diagrams to illustrate material or equipment for some portion of the <br /> Work. <br /> Specifications - (Same definition as for Technical Specifications hereinafter). <br /> Subcontractor - An individual, firm, or corporation having a direct contract with the <br /> CONTRACTOR or with any other Subcontractor for the performance of a part of the Work at the <br /> site. <br /> Substantial Completion - Refers to the date certified by the ENGINEER OF RECORD to when <br /> all conditions and requirements of permits and regulatory agencies have been satisfied, and <br /> when the Work has progressed to the point where, in the opinion of the ENGINEER OF <br /> RECORD, as evidenced by the Certificate of Substantial Completion/Notice of Completion as <br /> applicable, it is sufficiently complete, in accordance with the Contract Documents, so that the <br /> Work is available for beneficial occupancy and can be utilized for the purposes for which it is <br /> intended; or if there be no such certificate issued when final payment is due in accordance with <br /> Article 14, Paragraph 14.8. A Temporary Certificate of Occupancy or Certificate of Occupancy <br /> must be issued for Substantial Completion to be achieved, however, the issuance of a <br /> Temporary Certificate of Occupancy or Certificate of Occupancy or the date thereof are not to <br /> be determinative of the achievement or date of Substantial Completion. The terms "substantially <br /> complete" and "substantially completed" can be used interchangeably as applied to any Work <br /> refer to as "substantial completion" thereof. <br /> Supplementary General Conditions - The part of the Contract Documents which make additions, <br /> deletions, or revisions to these General Conditions. <br /> Supplier - A manufacturer, fabricator, supplier, distributor, material man, or vendor. <br /> Technical Specifications - Those portions of the Contract Documents consisting of the General <br /> Requirements and written technical descriptions of products and execution of the Work. <br /> Underground Utilities - All pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, <br /> tunnels, or other such facilities or attachments, and any encasements containing such facilities <br /> which have been installed underground to furnish any of the following services or materials: <br /> water, sewage and drainage removal, electricity, gases, steam, liquid petroleum products, <br /> telephone or other communications, cable television, traffic, or other control systems. <br /> Weather Delays - Work stoppage caused by abnormal inclement weather, where abnormal <br /> duration and frequency of rain as compared with the Weather Bureau data and supported by <br /> project logs, has caused the contractor to suspend critical path activities during the exceptional <br /> adverse weather event for more than fifty percent (50%) of the work period of the day <br /> exceptionally adverse weather. Weather delay claim can be made for work day only. No time <br /> extension will be allowed for weekend rains. <br /> Work - All matters and things whether completed or partially completed, and includes all other <br /> labor, materials, equipment and services provided or to be provided by the Successful Bidder in <br /> accordance with the Contract. <br /> 00700-3/39 (� <br />