Laserfiche WebLink
<br />3. Sheet A-0.050.00 <br />a. Provide setbacks from rear property line of bulkhead, not ECL. <br />RESPONSE: Setback has been provided. <br />b. Correct required tower separation of 100’. <br />RESPONSE: Please reference response to comment 4 above. <br />c. Show actual structure setbacks from all property lines. <br />RESPONSE: Actual Structural Setback has been added to drawing. <br />d. What is the use of the south side of property? Palms should be located along <br />the complete south area. <br />RESPONSE: Please note that this is a service drive to tower one MEP. ie FPL <br />Vault, Switch Gear ect. Palms may be an issue. <br />e. Provide driveway setbacks from both north and south property lines. <br />RESPONSE: Driveway setback have been added to the drawings. <br />f. Show driveway locations on adjacent properties with distance separation <br />pursuant to Sec. 265-47 D. <br />RESPONSE: Driveway separation has been added to drawing. We’ve also noted <br />that driveway are existing. <br />4. Sheet A-0.100.00 <br />a. Please verify Level B1 parking count. <br />RESPONSE: The Parking count shown is reflective of the shared parking <br />requirements. The layout as shown on B1 is intended to guarantee the number as <br />required by the shared parking count. <br />5. Sheet A-0.104.00 <br />a. Provide floor elevations. <br />RESPONSE: Elevations have been added to plan. <br />6. Sheet A-0.108.00/A-0.115.00 <br />a. Level 14 Plan not provided. <br />RESPONSE: Level 14 MEP plan has been added to the Site Plan Submission <br />7. Sheet A-0.115.00/A-0.145.00 <br />a. Level 45 is shown on both sheets. <br />RESPONSE: The layout has been corrected. Please reference plan sheet A- <br />0.145.00 <br />8. Sheet A-0.201.00 to -0.201.00 <br />a. Access is misspelled. <br />RESPONSE: Corrected. <br />b. Provide color renderings. <br />RESPONSE: Color of the provided elevations are in progress. <br />c. Building separation distance is 75’ not 80’ as stated on Sheet A-0.0101.00. <br />RESPONSE: Please reference Sheet A-0.010.03 for Building separation. <br />Building separation to be maintained at 75’. Please reference comment 4 above. <br />d. Provide property lines extension. <br />RESPONSE: Property line extension has been provided. <br />e. Provide setback dimension and also add setback diagram included on sheet A- <br />0.010.00 <br />RESPONSE: Setback Dimension and Information from Setback diagram has <br />been integrated into elevation. <br />9. Sheet A-0.301.00 <br />a. Notate direction of cross section elevation. <br />RESPONSE: Direction of cross section has been added to elevations. <br />10. Sheet L-2.000.00 <br />a. Show property lines. <br />RESPONSE: See Landscape response. Landscape response to be formalized <br />and integrated into this response. <br />11. Sheet L-6.000.00