My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IntelliTime Systems Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 16-04-03 Time and Attendance System
>
Responses
>
IntelliTime Systems Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 10:18:31 AM
Creation date
5/12/2016 10:18:12 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Employee Time and Attendance System
Bid No. (xx-xx-xx)
16-04-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IntelliTime Systems Corporation Response - Statement of Work <br /> City of Sunny Isles Beach, Florida <br /> public service function must remain open during training possibly requiring two <br /> classes to alternate staff between training and the public service function. Also <br /> looks at 24x7 facilities to determine if night classes or bringing staff in during the <br /> day is preferable. The availability of computer training rooms or lecture halls and <br /> lunch rooms are reviewed to plan the training. <br /> Configuration and Testing Phase <br /> Upon approval of the initial deliverables defining the scope of the engagement, <br /> IntelliTime Systems Corporation will configure the software to the required <br /> specifications as documented in the System Configuration and Test Plan. This <br /> includes defining the following parameters in the software to make it ready for testing <br /> by the City. <br /> + Configure Pay Cycles and Pay Periods — One Bi-Weekly Pay Cycle <br /> • Enter Holiday Calendar(s) <br /> • Define Workflows <br /> •: Configure Timecards for Required Data Collection Elements <br /> • Configure Timekeeping Rules <br /> • Configure User Schedules <br /> • Configure Employee Import Interface from HR <br /> • Configure Schedule Templates and Staffing Metrics <br /> + Configure IVR Hiring Scripts <br /> • Configure Overtime Hiring Lists and Rules <br /> • Configure Skills and Jobs <br /> Based on the rules documented in the System Configuration and Test Plan the <br /> system will be configured for the required timekeeping and attendance scenarios for <br /> the appropriate bargaining units, employee FLSA statuses and positions for <br /> example. As chapters of this document are completed they are forwarded to the <br /> client's Project Manager for review and approval until the entire plan is completed. <br /> The configured system will be installed on the file server at the City in test mode. In <br /> the detailed Project Work Plan a Pilot Test group will be identified that is <br /> representative of some of the more complex scenarios in the System Configuration <br /> and Test Plan. Pilot Test groups should consist of special or more complex <br /> timekeeping requirements. <br /> Execute the Testing and Training Plan <br /> The System Administrator training will be held at City locations. This class includes <br /> all system administrator interfaces and procedures over two to three days. The <br /> general administrator functions are covered and then the System Configuration and <br /> Copyright 2016, IntelliTime Systems Corporation Page 4 of 6 <br /> 5/10/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.