|
QUALIFICATIONS 5
<br />24CITY OF SUNNY ISLES BEACH LANDSCAPE ARCHITECT SERVICES RFQ NO. 16-04-02
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Jorge Ferrer
<br />13. ROLE IN THIS CONTRACT
<br />Quality Assurance / Quality Control
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />29
<br />b. WITH CURRENT FIRM
<br />22
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Bermello Ajamil & Partners, Inc., Fort Lauderdale, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Master of Architecture, University of Florida, 1993
<br />Bachelor of Architecture, University of Florida, 1986
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Intracoastal Parks
<br />Sunny Isles Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (if applicable)
<br /> 2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm
<br />QA/QC. Development of two vacant 1.5 acre parcels located between Collins Avenue and the Intracoastal Waterway to the
<br />west. The project included the addition of a 5’ tall concrete/CMU screen wall along the southern property line, decorative stone
<br />columns and an aluminum picket fence along the Intracoastal Waterway.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Arlen House Streetscape
<br />Sunny Isles Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (if applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />QA/QC - Reviewed all design and construction documentation relating to this right-of-way improvement project located in Sunny
<br />Isles Beach, Florida along the western side of Collins Avenue, south of 158th Street for approximately 550 linear feet of roadway.
<br />Scope of improvements includes an 8’ wide specialty paver sidewalk with waving bands of concrete pavers, a new six foot tall
<br />buffer/retaining wall, decorative stone columns, a vehicular gate system for an adjacent private condominium parking area, a
<br />bus shelter, landscaping, landscape lighting and a complete upgraded irrigation system.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Truman Waterfront Park
<br />Key West, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2010
<br />CONSTRUCTION (if applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />QA/QC. Development of an overall master plan for this 23-acre waterfront site adjacent to the historic Fort Zachary Taylor Park
<br />and Naval Base. The park master plan incorporates a redesigned 50-foot-wide waterfront pedestrian promenade, a pedestrian
<br />bridge to span Admiral’s Cut, an open air amphitheater with 200 fixed seats, a renovated Navy Generator Building to be reused
<br />as a restaurant, historical museum and public restrooms, an interactive water feature with two adjacent shaded playgrounds, an
<br />exercise trail with outdoor exercise stations, a 35,000-SF recreation center with an adjacent synthetic turf multi-purpose athletic
<br />and event field, and new horse stables for the Key West Police Department.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Springs Aquatic Facility
<br />Miami Springs, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br /> 2014
<br />CONSTRUCTION (if applicable)
<br /> Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager - Design criteria package for a new Aquatic Facility for the City of Miami Springs. The project includes the
<br />demolition of the existing pool, deck, building and parking lot, a new hybrid pool, pool deck, pool building, multi-purpose building,
<br />parking lot, landscaping and site improvements.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Joseph Caleb Center New Courthouse Annex/Additions and New
<br />Parking Garage, Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2009
<br />CONSTRUCTION (if applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />QA/QC. A new 2-story Courthouse, three-story parking garage and retail located at the Caleb Community Center. Once
<br />completed, B&A will seek Silver certification, at a minimum, under the LEED Green Building Rating System of the U.S. Green
<br />Building Council New Construction. The new two story courthouse has approximately 39,000 SF of public, semi-public spaces and
<br />private. The new three story parking garage will contain 475 parking spaces and approximately 190,000 SF of constructed area to
<br />accommodate parking booths, control gates and approximately 20 private spaces on the ground floor area.
<br />
<br />x
<br />x
<br />x
<br />x
|