Laserfiche WebLink
 City of Sunny Isles Beach, Florida  <br />Shoreline Surveying and Mapping Consulting Services  <br />  <br />  <br />  <br />CB&I Environmental & Infrastructure, Inc. RFQ No. 16‐06‐01   <br />  33 <br />10C062016D – 631216982   <br />  <br />the County. CB&I has always performed the tasks within the allotted schedule and within budget. CB&I  <br />recently completed this survey again in April of 2014. Surveys were conducted at each Florida Department of  <br />Environmental Protection (FDEP) R‐monument (R‐1 to R‐113) located at approximately 1000 foot intervals  <br />throughout the project area. Additional intermediate profiles were surveyed from theoretical control points  <br />at the halfway point (straight line distance) between major monuments. A total of 154 profiles stations were  <br />surveyed.   <br />Survey Technician, Broward County Mean High Water and Erosion Control Line, Broward County, Florida  <br />Olsen & Associates (J/V) contracted CB&I to provide, in part, survey services for the 2014 Mean High Water  <br />survey and preparation of an erosion control line. Surveyors from CB&I performed the survey and prepared  <br />all required drawings, public notices, and other platting items as required by Chapter 161.141 of the Florida  <br />Statutes. Under the direct supervision of a Florida Registered Surveyor and Mapper, Mr. Walker was  <br />responsible for collection of survey data using the RTK GPS system. He also assisted with data reduction and  <br />map preparation.  <br />Survey Technician, Broward County S.R. A1A Emergency Repair, Broward County, Florida  <br />Broward County selected CB&I to provide a topographic and hydrographic surveys. The survey area was  <br />located along A1A from FDEP monuments R‐63 to R‐71. CB&I collected profiles at 200 foot spacing and at  <br />each FDEP monument. CB&I utilizes state of the art survey technology to perform all tasks including Real  <br />Time Kinematic Global Positioning Systems, dynamic motion compensators, and highly accurate digital  <br />sounders to ensure a top quality product for the County. The survey was conducted as an emergency  <br />response to the damages caused by Hurricane Sandy. CB&I conducted pre and post construction surveys as  <br />well as additional monitoring surveys of the affected area. Under the direct supervision of a Florida  <br />Registered Surveyor and Mapper, Mr. Walker was responsible for hydrographic survey data acquisition using  <br />RTK, Motion Compensator, and Digital Echo Sounder as well as topographic data collections using RTK GPS.  <br />He also assisted with data reduction and report preparation.