Laserfiche WebLink
SSeeaa DDiivveerrssiiffiieedd,, IInncc.. <br />2211 NNWW 22nndd SSttrreeeett <br />DDeellrraayy BBeeaacchh,, FFlloorriiddaa 3333444444 <br />556611..224433..44992200 ((PPhhoonnee)) –– 556611..224433..44995577 ((FFaaccssiimmiillee)) <br />wwwwww..sseeaaddiivveerrssiiffiieedd..ccoomm <br /> <br />AApppprrooaacchh//MMeetthhooddoollooggyy <br />City of Sunny Isles Beach <br />Shoreline Surveying and Mapping <br />Consulting Services <br />RFQ No. 16-06-01 <br /> <br />After completion of the initial planning effort, field survey operations will be scheduled and <br />implemented. The Survey Manager will track weather and tide conditions and plan the field survey <br />effort based on optimum conditions for the scheduled task. The Survey Manager will also coordinate <br />with City staff to inform them of survey schedule and location of data collection, and also discuss <br />beach access issues, as pertinent to the data collection effort. During the course of data collection, <br />QA/QC procedures including equipment calibration checks and other SDI established data collection <br />protocol will be monitored by the Survey Manager to ensure accuracy and quality of data. All data is <br />uploaded daily to SDI servers, either directly or via electronic data transfer methods for prompt review <br />by the Survey Manager or other technicians assigned to the project. It is a strict and mandatory policy <br />that all collected data is thoroughly reviewed for accuracy prior to crew demobilization. <br /> <br />After completion of data collection and prior to the commencement of data processing, the Project <br />Manager will again review with the computer / CADD technicians the specifications for charts, <br />electronic data formatting and other deliverables associated with the project. The development of final <br />deliverables follows a very strict protocol for QA/QC. Draft deliverables are first produced and reviewed <br />by no less than two (2) qualified technicians to check quality and accuracy of data, chart completeness <br />and overall conformance with project specifications. For coastal monitoring surveys where historical data <br />is available, comparative profile plots are produced and carefully analyzed for consistency, specifically <br />looking for anomalies in data and quality of offshore and upland closure. After this initial review of data, <br />charts and other deliverables, computer / CADD technicians proceed to prepare final deliverables, which <br />undergo a second QA/QC process, which again involves no less than two (2) technicians including the <br />Project Manager and Professional Surveyor and Mapper in responsible charge of the project. After <br />thorough review of the final deliverables, final charts and/or Survey Report will be certified by a <br />Professional Surveyor and Mapper. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />