My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bowman
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-01) Shoreline Surveying and Mapping Consulting Services
>
Responses
>
Bowman
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 4:12:38 PM
Creation date
6/28/2016 10:11:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bowmanconsulting.com <br />Louie G. Bush, PSM <br />QA/QC Manager <br />Professional Education <br /> Education, Southeastern University, <br />1974 <br /> Pre-Engineering, Hillsborough <br />Community College, 1969 <br />Professional Registrations <br /> Professional Surveyor & Mapper: <br />Florida (5403) <br />Professional Associations <br /> Florida Surveying & Mapping <br />Society <br /> US Army Corps of Engineers <br />USACE/Industry BIM and CIM <br />Consortia <br /> TRB AFB80 Geospatial Data <br />Acquisition Technologies in Design <br />and Construction <br /> U.S. Institute of Building <br />Documentation <br /> buildingSMART alliance a council of <br />the National Institute of Building <br />Sciences – Board of Directions <br />Mr. Bush is a licensed professional surveyor with over 35 years of experience in <br />photogrammetric mapping and surveying. He has experience in all phases of <br />photogrammetric mapping including project management, flight planning, film <br />processing, precision film scanning, stereo compilation, and ortho generation. He is <br />experineced in Subsurface Utility Engineering (SUE). Mr. Bush has worked extensively <br />with the development of aerial data base maps for GIS applications, as well as use in <br />photo interpolation for environmental issues. In 2001 Mr. Bush was appointed by the <br />Govenor to sit on the Florida Regulatory Board Board of Surveyors and Mappers, <br />holding the only photogrammetric seat on the board. He served for a total of eight <br />years before reaching term limits. Currently he serves on the Florida Regulatory Board <br />for Geologist and the Probable Cause Panel for the Florida Regulatory Board for <br />Surveyors and Mappers. <br />Subsurface Utility Engineering & Cartographhic Mapping, Pinellas County, Florida <br />While employed at previous firm, Mr. Bush performed surveying services for this <br />initiative approach to identifying and cartographic mapping both the horizontal <br />and vertical location of underground utilities within the county right-of-ways. This <br />data was designed to be superimposed onto digital orthophotography. The three <br />dimensional location of the utilities allow Pinellas County to design around utilities <br />during construction. <br />E911 Mapping/Photogrammetry, Hillsborough County, Florida <br />While employed at previous firm, Mr. Bush performed surveying services for this <br />countywide project. The project took place over several years and included the <br />centerline and entrance mapping for the E911 service center. <br />IMC/Cargill Fertilizer Miscellaneous Reclamation Projects <br />While employed at previous firm, Mr. Bush performed surveying services for these <br />projects. Typical projects were topographic mapping at 1”= 200’, with 2’ contours and <br />digital images. We were responsible for ground control as well as mapping. <br />Department Of Interior PM/Terrestrial LiDAR, Washington, DC <br />While employed at previous firm, Mr. Bush performed surveying services on this <br />project. The project scope included the creation of an as-built model of the open space <br />to be renovated into the new cafateria used by the Department of Interior. Multiple <br />scan locations were required during the demolition phase of the project. Project was <br />completed and delivered with two weeks. <br />U.S. Supreme Court House PM/Terrestrial LiDAR, Washington, DC <br />While employed at previous firm, Mr. Bush performed surveying services on this <br />project. Due to the high security within the building this project had to be completed <br />on site. No information was allowed to the leave the complex. The project consisted <br />of two areas of interest, one within an attic space and one in a sub-floor which had <br />not been cleared for entrance due to the presence of asbestos materials. We were able <br />to scan the sub-floor by raising the sensor through a series of hatches. The job was <br />completed and delivered to the Architect of the Capital within seven working days. <br />Page 34
The URL can be used to link to this page
Your browser does not support the video tag.