Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME <br />Jerry Renick, CEP <br />13.ROLE IN THIS CONTRACT <br />Environmental <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />29 <br />b.WITH CURRENT FIRM <br /> 14 <br />15.FIRM NAME AND LOCATION (City and State) <br />Wantman Group, Inc., West Palm Beach, Florida <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science, Biology - Washington College <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida, Certified Environmental Professional <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Wetland Scientist #1831 Arborist #FL-0427A <br />Pesticide Applicator #CM15121 <br />Jerry has over 29 years of experience in the environmental consulting, regulatory, and restoration fields in Florida. He brings his <br />many years of government regulatory experience to the firm, with nearly 10 years of service with Palm Beach County Department <br />of Environmental Resources Management (ERM). He has the ability to negotiate difficult environmental issues between the <br />private and public sectors, making his experience unique. Jerry has provided expert witness testimony in several instances. He <br />specializes in wetland studies, jurisdictional determinations, Environmental Resource Permitting, mitigation plans, tree inventories, <br />listed species surveys, submerged resource surveys, and dock permitting. <br />. <br />. <br />19. RELEVANT PROJECTS [Relevant Projects:] <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />Wakodahatchee Wetlands <br />Palm Beach County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2003 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Environmentalist. This site was developed by PBC Water Utilities as the very first created wetland in the County. The site was <br />originally 56 acres of percolation ponds from the main water treatment facility in the county. Land Design South was involved <br />from the inception, creating the Master Plan of the existing plant operations, future land use, the proposed site plan and <br />interpretive signage. The complexity of the project required public charettes to incorporate community opinion. The project <br />received the distinguished Environmental Sustainability Honor Award in 2009. <br /> <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />Grassy Waters Preserve <br />West Palm Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If Applicable) <br />2014 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Environmentalist. As a subconsultant, WGI Land Design Services was involved in the inception of the design to provide Master <br />Plan studies, developing research for funding and budget issues, as well as conducting workshops with regional specialists in <br />environmental permitting for the development of this facility in a pristine environment. Land Design Services produced all <br />construction documentation for the boardwalk system, signage, parking, and helicopter pad. <br />c. <br />(1)TITLE AND LOCATION (City and State) <br />Phase I and II ESA’s, Wetland Delineations and Other Biological <br />Monitoring <br />St. Lucie County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Environmental Professional. As part of a continuing contract with St. Lucie County, Rick has prepared multiple Phase I and II <br />Environmental Site Assessments during the County’s due diligence period for land acquisitions. Rick was responsible for <br />carrying out the research and investigation of the properties to identify any recognized environmental conditions (REC’s) that <br />may indicate the presence or threat of soil and groundwater contamination. Rick also assisted in performing and preparing the <br />Phase II site investigation on the Roberts Preserve property investigating the presence of chlorinated pesticides and petroleum <br />products in the soil of a farm located along the North Fork of the St. Lucie River. <br />. <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />Pine Jog Elementary <br />West Palm Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Environmental Professional. The goal of the design was to create a demonstration garden utilizing one hundred percent native <br />plant materials which will be used to educate the center’s users of the various methods in which native plant material can be <br />successfully incorporated into a residential landscape setting. In correlation with the use of native plant materials, special <br />attention was given to utilizing plant materials with low water needs that would support a variety of native wildlife species. <br />Through the use of these design strategies a garden was created that not only compliments the culture of sustainability existing <br />throughout the center but also serves as an educational resource to the surrounding community. <br />e. <br />(1)TITLE AND LOCATION (City and State) <br />Palm Shooting Range, <br />Palm Beach County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If Applicable) <br />2015 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Environmental Professional. Jerry coordinated with project team and FWC for an on site sub-meter accuracy Global Positioning <br />System tree inventory and tabulation of all trees and palms on the project site. Coordination for permit applications, tree <br />preservation, and tree mitigation plan approval will be prepared under Jerry’s supervision. <br />. <br />STANDARD FORM 330 Page 34