|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12.NAME
<br />John Abbott, PG
<br />13.ROLE IN THIS CONTRACT
<br />Environmental Services
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />20
<br />b.WITH CURRENT FIRM
<br />1
<br />15.FIRM NAME AND LOCATION (City and State)
<br />Wantman Group, Inc., West Palm Beach, Florida
<br />16.EDUCATION (DEGREE AND SPECIALIZATION)
<br />Master of Science, Geology, New Mexico Tech
<br />Bachelor of Science, Geology, Virginia Tech
<br />
<br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Florida, Professional Geologist
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />FDEP Stormwater Management Inspector FWC Authorized Gopher Tortoise Agent
<br />John has diverse experience in environmental consulting, including environmental planning, permitting, wetland mitigation and
<br />design, wildlife surveys, and contamination assessment. He has been a project manager on multi-million dollar environmental
<br />projects. John has worked on land development and environmental restoration projects throughout Florida, including marine and
<br />coastal areas, the Everglades, Lake Okeechobee, the Florida Keys, agricultural field and urban development areas.
<br />19. RELEVANT PROJECTS [Relevant Projects:]
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />Design-Build for I-95 Noise Barrier Wall
<br />Delray Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Environmental Lead. John provided environmental services for construction of a sound barrier wall along the east side of the I-
<br />95 right-of-way from north of the C-15 Canal to south of Linton Boulevard. Project duties included preconstruction
<br />environmental surveys including a survey for gopher tortoises.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />NEPA Categorical Exclusions for Various Projects
<br />Fort Lauderdale, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Lead Environmental Planner: John provided field reviews, contamination screening, and oversight of historical structure
<br />assessments and biological assessments for Categorical Exclusions for various streetscape improvements in Fort Lauderdale.
<br />Projects included Sistrunk Boulevard, Dorsey Riverbend, Northwest Neighborhood, and Flagler Drive.
<br />c.
<br />(1)TITLE AND LOCATION (City and State)
<br />Arch Creek Pedestrian Bridges
<br />North Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Lead Environmental Scientist. For these two single span shared use bridges along the Arch Creek Bicycle Path connecting
<br />NE 135th Street and the FIU Biscayne Bay Campus, John directed the environmental services which included an ecological field
<br />inspection to document the presence of wetlands and any listed species located on the site and processing permit applications
<br />through the SFWMD, the USACE, and Miami-Dade County RER. Mangroves along the creek banks that would be impacted by
<br />construction activities were located and measured to determine the replacement canopy required by DERM.
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />Indigo Snake Monitoring and Permit Compliance
<br />Palm Beach County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager: At over 15,000-acres, the Everglades Agricultural Area (EAA) Reservoir A-1 impoundment is a major
<br />component of CERP and the restoration of the Everglades. John provided oversight of a project to monitor for protected
<br />species and assist with permit compliance. The monitoring was conducted during construction with the goal of reducing the
<br />likelihood that construction will harm protected species such as the Eastern indigo snake. John prepared field reports, ensured
<br />compliance with permits, and made recommendations on protection measures during construction.
<br />
<br />e.
<br />(1)TITLE AND LOCATION (City and State)
<br />Grant Application for Keegan Clair Park Public Boat Dock
<br />City of Indian Rocks Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Indian Rocks Beach, City of Indian Rocks Beach, Grant Application Writer: Grant application writer for a FFWCC Florida
<br />Boating Improvement Program Grant Application for Boating Access Facilities for a proposed public dock at the Keegan Clair Park.
<br />Located on the Intracoastal Waterway, the site contained a shoreline of mangroves, sea grapes, and oysters. Using a 400-ft long
<br />dock that paralleled the shoreline but extended into the Intracoastal Waterway, the result met the desired boat capacity, water
<br />depths, Intracoastal Waterway setback requirements, and avoided the mangroves, thus minimizing environmental impacts and
<br />streamlining the permitting process. As part of the grant application, John provided a project description and justification,
<br />conceptual design, cost estimate for permitting and construction, and environmental assessment.
<br />STANDARD FORM 330 (1/2004) PAGE 1
<br />Page 36
|