Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME <br />Larry M. Smith, P.E. <br />13.ROLE IN THIS CONTRACT <br />Electrical Engineer <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />25 <br />b.WITH CURRENT FIRM <br />15 <br />15.FIRM NAME AND LOCATION (City and State) <br />Smith Engineering Consultants, Inc, 2161 Palm Beach Lakes Blvd., Suite 312, West Palm Beach, FL 33409 <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science in Electrical Engineering <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida/Electrical Engineering <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Post-graduate studies at FAU in telecommunications, Tau Beta Pi (Engineering Honor Society), IEEE, Florida Engineering Society (Past <br />President of the Palm Beach Chapter), Florida Building Code electrical technical advisory committee, FES state energy committee. <br />19. RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />SFWMD Stormwater Treatment Area (STA)-1W <br />Palm Beach County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />1999 <br />CONSTRUCTION (If Applicable) <br />2003 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Electrical design for the gate control structure and trash rakes. This included the electrical service and distribution, controls, lighting, <br />instrumentation, and telemetry systems. The telemetry system was designed using the District’s standard RTU design. <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />SFWMD P.S. 319 <br />Loxahatchee, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2005 <br />CONSTRUCTION (If Applicable) <br />2005 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Construction administration for the electrical systems of this pump station designed by the Army Corps of Engineers. We observed the electrical <br />installations and prepared the contract record drawings for review by the Corps. Corrections were made to the electrical design drawings in <br />accordance with the actual construction observed by us and as reported by the contractor. <br />c. <br />(1)TITLE AND LOCATION (City and State) <br />Mirasol Pump Station <br />Palm Beach Gardens, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2001 <br />CONSTRUCTION (If Applicable) <br />2003 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Electrical design for a new stormwater pump station. This pump station consisted of six (6) electric motor operated pumps with both upstream <br />and downstream water level monitoring. A backup diesel generator was designed to provide power for full pumping capacity. Reduced-voltage <br />motor starters were designed to reduce the starting inrush current for the large electric motors. Electrical design included motor operated gates <br />for control structures, electrical service and distribution, lighting, controls, instrumentation, and telemetry systems. <br /> <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />City of Lake Worth Master Pump Station <br />Lake Worth, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2002 <br />CONSTRUCTION (If Applicable) <br />2003 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Electrical design including power, controls, instrumentation and telemetry for the conversion of the existing wetwell pump station to an in-line <br />booster station. Variable frequency drives (VFD’s) were used to match the varying wastewater flow into and out of the pump station. An <br />upgraded telemetry system was designed to replace the existing, aging system, and to provide control and status reporting to the existing central <br />station. <br />e. <br />(1)TITLE AND LOCATION (City and State) <br />Gateway Community Development District <br />Ft. Myers, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2004 <br />CONSTRUCTION (If Applicable) <br />2005 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Electrical design including power, controls, instrumentation and telemetry for the rehabilitation of an existing reclaimed water pump station. <br />Five (5) new pumps were provided with variable frequency drives (VFD’s) to provide water to the local community, including golf course <br />irrigation. A hydropneumatic tank with an air compressor system was installed to help maintain water pressure. <br />Page 37