|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12.NAME
<br />Larry M. Smith, P.E.
<br />13.ROLE IN THIS CONTRACT
<br />Electrical Engineer
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />25
<br />b.WITH CURRENT FIRM
<br />15
<br />15.FIRM NAME AND LOCATION (City and State)
<br />Smith Engineering Consultants, Inc, 2161 Palm Beach Lakes Blvd., Suite 312, West Palm Beach, FL 33409
<br />16.EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Science in Electrical Engineering
<br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Florida/Electrical Engineering
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Post-graduate studies at FAU in telecommunications, Tau Beta Pi (Engineering Honor Society), IEEE, Florida Engineering Society (Past
<br />President of the Palm Beach Chapter), Florida Building Code electrical technical advisory committee, FES state energy committee.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />SFWMD Stormwater Treatment Area (STA)-1W
<br />Palm Beach County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />1999
<br />CONSTRUCTION (If Applicable)
<br />2003
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Electrical design for the gate control structure and trash rakes. This included the electrical service and distribution, controls, lighting,
<br />instrumentation, and telemetry systems. The telemetry system was designed using the District’s standard RTU design.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />SFWMD P.S. 319
<br />Loxahatchee, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2005
<br />CONSTRUCTION (If Applicable)
<br />2005
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Construction administration for the electrical systems of this pump station designed by the Army Corps of Engineers. We observed the electrical
<br />installations and prepared the contract record drawings for review by the Corps. Corrections were made to the electrical design drawings in
<br />accordance with the actual construction observed by us and as reported by the contractor.
<br />c.
<br />(1)TITLE AND LOCATION (City and State)
<br />Mirasol Pump Station
<br />Palm Beach Gardens, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2001
<br />CONSTRUCTION (If Applicable)
<br />2003
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Electrical design for a new stormwater pump station. This pump station consisted of six (6) electric motor operated pumps with both upstream
<br />and downstream water level monitoring. A backup diesel generator was designed to provide power for full pumping capacity. Reduced-voltage
<br />motor starters were designed to reduce the starting inrush current for the large electric motors. Electrical design included motor operated gates
<br />for control structures, electrical service and distribution, lighting, controls, instrumentation, and telemetry systems.
<br />
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />City of Lake Worth Master Pump Station
<br />Lake Worth, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2002
<br />CONSTRUCTION (If Applicable)
<br />2003
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Electrical design including power, controls, instrumentation and telemetry for the conversion of the existing wetwell pump station to an in-line
<br />booster station. Variable frequency drives (VFD’s) were used to match the varying wastewater flow into and out of the pump station. An
<br />upgraded telemetry system was designed to replace the existing, aging system, and to provide control and status reporting to the existing central
<br />station.
<br />e.
<br />(1)TITLE AND LOCATION (City and State)
<br />Gateway Community Development District
<br />Ft. Myers, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2004
<br />CONSTRUCTION (If Applicable)
<br />2005
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Electrical design including power, controls, instrumentation and telemetry for the rehabilitation of an existing reclaimed water pump station.
<br />Five (5) new pumps were provided with variable frequency drives (VFD’s) to provide water to the local community, including golf course
<br />irrigation. A hydropneumatic tank with an air compressor system was installed to help maintain water pressure.
<br />Page 37
|