My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WANTMAN GROUP RFQ 16-06-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-02) Landscape Architect Services (Final)
>
Responses
>
WANTMAN GROUP RFQ 16-06-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 11:06:44 AM
Creation date
7/18/2016 11:03:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />4 <br />21.TITLE AND LOCATION (City and State) <br />Abacoa Town Center <br />Jupiter, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (if Applicable) <br />N/A <br />23. PROJECT OWNER’S INFORMATION <br />a.PROJECT OWNER <br />FLF Holdings <br />b.POINT OF CONTACT NAME <br />Josh Simon <br />c.POINT OF CONTACT TELEPHONE NUMBER <br />561.575.6454 <br />24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The Abacoa Town Center was developed approximately 15 years ago as the central commercial district to <br />support the overall Abacoa development. Over the years, the Town Center has lost many of its tenants and <br />has lost the life that once filled the Center. WGI’s Land Design Services Division was hired to develop an <br />overall master plan and detailed concept plans for key areas throughout the Town Center to help with the <br />revitalization efforts. The overall design goal was to create a state of the art destination for Abacoa <br />communities and surrounding neighborhoods to experience local art, culture, music, fun and games in a safe, <br />educational and family-friendly interactive environment which will reinvigorate life into the Town Center. The <br />design process began with client meetings and extensive research into successful downtown and town center <br />developments. Ideas were generated and the overall program was developed. The program was then refined <br />into one overall master plan and several detailed concept plans and renderings to convey the intent of the <br />program and design. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT [Section C Firms:] <br />a. <br />(1)FIRM NAME <br />Wantman Group, Inc. <br />(2)FIRM LOCATION (City and State) <br />West Palm Beach, FL <br />(3)ROLE <br />Prime Consultant <br />b. <br />(1)FIRM NAME (2)FIRM LOCATION (City and State)(3)ROLE <br />STANDARD FORM 330 Page 41
The URL can be used to link to this page
Your browser does not support the video tag.