|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Jose McCray
<br />13. ROLE IN THIS CONTRACT
<br /> CEI
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 34
<br />b. WITH CURRENT FIRM
<br /> 3
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Chen Moore and Associates, Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. McCray is a senior inspector for Chen Moore and Associates. Mr. McCray has over 31 years of construction experience, from
<br />surveying through project management. His present responsibilities include coordination and monitoring of construction activities
<br />including governmental projects and site development for residential, commercial and industrial use projects. He serves as li aison to
<br />owners, contractors, subcontractors, residents and governmental agencies. Additional responsibilities include overseeing the
<br />review/processing of change orders, progress payments and reports, and representation of owners and engineers at pre -
<br />construction meetings and other related conferences.
<br />
<br />Mr. McCray’s most recent experience includes serving as Director of Construction Services at a South Florida multi -discipline
<br />engineering firm. His responsibilities included managing staff and construction administration serv ices for several neighborhood
<br />improvement projects for Broward County Water and Wastewater Services and several private residential/commercial land
<br />development clients. These projects included the construction of water distribution, sewer, wastewater lift stations, drainage and
<br />paving. Mr. McCray has also served as a Project Manager and Superintendent for large South Florida contracting companies.
<br />
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Downtown Coral Springs Streetscaping
<br />Coral Springs, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If Applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Construction Specialist. CMA was contracted by the City of Coral Springs to assist the Coral Springs CRA in the planning,
<br />design, permitting and construction support of various streetscaping improvements in Downtown Coral Springs. As the prime
<br />consultants, CMA provided civil engineering, landscape architecture, environmental permitting and construction engineering
<br />and inspection services for the project. The project included implementing Complete Street concepts for NW 31st Court, NW
<br />94th Avenue and NW 32nd Street. Cost $ 4,100,000.00 Fee $ 235,739.98
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />East Bird Rd Corridor Sanitary Sewer Improvement
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If Applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Construction Specialist. The project intends to connect various small commercial sites on both sides of the Bird Road
<br />Corridor as well as the shopping center at the NW corner of Red Road and Bird Road and nearby David Fairchild Elementary
<br />School, all of which are currently served by septic systems. The project includes an initial engineering analysis phase with the
<br />preparation of a technical memorandum with options and recommendations for pump strategy, small and large pump station
<br />selection, power, maintenance, permitting considerations, etc. Cost $ 2,019,686.00 Fee $ 199,186.50
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />City Center Right-of-Way and Utility Improvement Project
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If Applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Construction Specialist. CMA is under contract with the City of Miami Beach to perform planning, design and construction
<br />administration services for the infrastructure redevelopment within public right -of-way areas of the City Centerneighborhood in
<br />downtown Miami Beach. The project scope included stormwater drainage, sanitary force main, and 8,700 LF of 8 -inch water
<br />main infrastructure improvements, along with streetscaping, landscaping, and lighting upgrades. Cost $ 21,200,000 Fee $
<br />3,611,340.00
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />South Pointe Phase III/IV/V - Right-of-Way Improvement Project
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If Applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Construction Specialist. CMA is the prime consultant and is responsible for providing surveying, planning, geotechnical
<br />investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and
<br />inspection services. The project encompasses approximately 19,000 LF of ROW infrastructure improvements including 9,300
<br />LF 8" water main replacements, stormwater drainage improvements, paving & grading, streetscaping enhancements,
<br />landscaping improvements, lighting improvements, and roadway reconstruction. Additionally, due to existing listed
<br />contaminated sites within the proximity of the right of way improvements, environmental coordination including contaminated
<br />sites analysis and consideration of the radius of influence was necessary for coord inating dewatering operations. Cost $
<br />10,500.000.00 Fee $2,305,354.06
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />FIU-Biscayne Bay Campus Student Housing
<br />N Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If Applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Construction Specialist. CMA currently works as a sub consultant to PGAL for the design, permitting and construction
<br />administration of a new 595 bed student dormitory on the Biscayne Bay Campus of FIU. CMA’s responsibilities include
<br />providing all site services for the project including survey, geotechnical, civil and landscape services. The site program in cludes
<br />a resort style swimming pool with hammocks, barbecue areas, outdoor seating, and cabana, bicycle parking facilities,
<br />pedestrian pathways, site seating and a 300 space parking facility. Cost $ 50,000,000.00 Fee $ 276,100.00
<br /> STANDARD FORM 330 (6/2004) PAGE 2
<br />
|