Laserfiche WebLink
<br />3. Full Size Patterns and Lettering: Provide CONSULTANT with full-size <br />patterns of each sign element to be fabricated. All items noted as ''use <br />camera ready art" shall be represented by a full size photocopy of art in place <br />on pattern. <br /> <br />4. Supplementary Product Literature: 'The fabricator will furnish <br />CONSULTANf with'manufacturers' literature describing the' general <br />properties of each product or component to be used in the Work. <br /> <br />S. Extra Materials: Deliver extra materials to the CITY in manufacturer's <br />original packing, including touch up paint, lamps, hardware, installation <br />materials, inserts, etc., as may be required (including touch up paint for each <br />color used in one quart can minimum). <br /> <br />1.04 pERMITS <br /> <br />CONTRACTOR shall make all submittals for pennits, shall be responsible for paying all <br />fees, making adjustments as required, or any task necessary for obtaining local building and <br />installation Sign Permits for the proper execution of the Work. <br /> <br />1.05 QUALITY ASSURANCE <br /> <br />A. Work-In-Progress Approval: Provide work-in-progress sign for approval by <br />CONSULTANT. Sign CONTRACTOR to provide sample of each requested type <br />of sign. Sample signs are to be reviewed in Miami so that work may be examined <br />by CITY and CONSULTANT and any necessary adjustments can be made during <br />fabrication. Adjust unsatisfactory items as directed. <br /> <br />B. CONSULTANT, at hislher/their discretion, may visit the fabricator's shop during <br />construction to examine the Work in progress. All visits-'would be coordinated in <br />advance with Sign fabricator. <br /> <br />C. Regulatory Requirements: Comply with applicable requirements of the laws, codes <br />ordinances, and regulations of Federal, State and Municipal authorities having <br />jurisdiction Obtain necessary approvals and permits for all such authorities. <br /> <br />D. Markings and Labels: No labels or markings are to be used unless required by <br />authorities per code. If necessary, located markings and other identifications so as <br />to be concealed from public view and as acceptable to CONSULTANT. <br /> <br />E. Final Location of Signs: The exact fmallocations of the signs. shall be directed by <br />CONSULTANT and confirmed at the site. CONTRACTOR shall arrange for <br />meetings at the site to accommodate CONSULTANT'S direction of final locations. <br /> <br />02841-2 <br /> <br />/l <br />