My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2004-680
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2004
>
Reso 2004-680
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 3:42:11 PM
Creation date
1/25/2006 1:57:38 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2004-680
Date (mm/dd/yyyy)
06/03/2004
Description
Approving Agmt. Awarding Bid No. 04-04-01 to Jade Communications Inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7. Which sheets should vendors receive from Miami T -square when they pick up the <br />architectural drawings (see section 14.20 of the RFP)? <br />., The following electrical sheets: <br />i. E.2.311 <br />11. E.2.312 <br />lll. E2.321 <br />IV. E2.322 <br />V E.2.331 <br />VI E2.341 <br />V11. EO.IOO (legend) <br />Vlll. E.0.300 (additional notes) <br />, In addition, the following are the final furniture plan sheets which you <br />may refer to if desired: <br />i. A.2.510 <br />11. A.2.511 <br />111. A.2.520 <br />IV. A.2.530 <br />V A.2.540 <br />8. Is there a bond requirement? <br />~ No, there is no bond requirement <br />9. The RFP specifies Belden cable. Can another cable manufacturer be substituted <br />in order to meet the manufacturer warranty requirements for the installation? <br />~ Yes, equivalent cable may be substituted to meet the manufacturer <br />warranty requirements. <br />10. In the RFP document, diagram 14.2 shows 38 locations on the 4th floor, while <br />diagram 14.8 shows 40 locations on the 4th floor. Which is correct? <br />~ Diagram 14.2 is correct. There are 38 locations on the 4th floor. <br />11. What is the property address? <br />~ 18070 Collins Avenue, Sunny Isles Beach. <br />12. Who should be contacted to obtain the architectural drawings (see section 14.20 <br />of the RFP) <br />, Contact the Coral Gables office of Miami T-square at 305.446.8816 and <br />speak with Helmutt, Victoria, or Lucius. If you have any problems obtaini <br />ng the plans please contact the Architect directly - Larry Kline at <br />305.447.3574. <br />13. What is the deadline for bid submission? <br />~ All sealed bids must be received by the City Clerk by 10:00 Al\rl on May <br />3, 2004. <br />14. Can Mohawk cable be used for this project? <br />~ See question #9. <br />15 RFP section 6.1 specifies 6 port faceplates, but all locations are be run with 4 <br />cables with the exception of the 1st floor conference room locations which contain <br />6 cables. Should 4-port faceplates be used for locations with 4 cables? <br />~ Yes, 4 or 6 port faceplates should be used as appropriate. <br />16. Will the copper and fiber optic riser cables be run within continuous conduit from <br />the Computer Room #3-016 to the teleo closets, alleviating the need for plenum <br /> <br />S\B <br />
The URL can be used to link to this page
Your browser does not support the video tag.