My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />SECTION 01045 <br /> <br />CUTTING AND PATCHING <br /> <br />n <br /> <br />LJ PART1-GENERAL <br /> <br />1.01 <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />WORK INCLUDED <br /> <br />A. <br /> <br />Contractor shall be responsible for all cutting, fitting and patching, including attendant <br />excavation and backfill, required to complete the work or to: <br /> <br />1. Make its several parts fit together properly. <br /> <br />2. <br /> <br />Uncover portions of the Work to provide for installation of ill-timed work. <br /> <br />3. <br /> <br />Remove and replace defective work. <br /> <br />4. <br /> <br />Remove and replace work not conforming to requirements of Contract <br />Documents. <br /> <br />5. <br /> <br />Remove samples of installed work as specified for testing. <br /> <br />6. <br /> <br />Provide routine penetrations of non-structural surfaces for installation of piles, <br />piping, and concrete footings. <br /> <br />7. <br /> <br />Investigate subsurface conditions or utilities. <br /> <br />" <br /> <br />1.02 RELATED WORK <br /> <br />LJ <br /> <br />," <br /> <br />1.03 <br /> <br />L.J <br /> <br />" <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />" <br /> <br />L.J <br /> <br />" <br /> <br />06/05 <br /> <br />L.J <br /> <br />A. <br /> <br />Section 01010: Summary of Work <br /> <br />SUBMITTALS <br /> <br />A. <br /> <br />Submit a written request to the Engineer well in advance of executing any cutting or <br />alteration that affects: <br /> <br />1. Work of the Owner or any separate contractor. <br /> <br />2. <br /> <br />Structural value or integrity of any element of the Project. <br /> <br />3. <br /> <br />Integrity or effectiveness of weather-exposed or moisture-resistant elements or <br />systems. <br /> <br />4. <br /> <br />Efficiency, operational life, maintenance or safety of operational elements. <br />Visual qualities of sight-exposed elements. <br /> <br />01045-1 <br /> <br />03-4138.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.