My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. Stability of Excavations: <br />1. Slope sides of excavations to comply with local codes and ordinances <br />having jurisdiction. <br />1 06/07 02221 -7 03 -4197 <br />2. Shore and brace where sloping is not possible because of space <br />restrictions or stability of material <br />excavated. <br />3. Maintain sides and slopes of excavations in safe condition until <br />completion of backfilling. <br />K. Shoring and Bracing: <br />1. Establish requirements for trench shoring and bracing to comply with <br />local codes and authorities having jurisdiction. <br />2. Maintain shoring and bracing in excavations regardless of time period <br />excavations will be open. Carry down shoring and bracing as excavation <br />progresses. <br />L. Dewatering: <br />1. Prevent <br />surface water and subsurface or roundwater from flowing into <br />9 g <br />excavations. <br />2. Do <br />not allow water to accumulate in excavations. <br />3. Provide and maintain pumps, well points, sumps, suction and discharge <br />lines, and other dewatering system components necessary to convey <br />water away from excavations. <br />M. Stockpile satisfactory excavated materials where directed, until required for <br />backfill or fill. Place, grade and shape stockpiles for proper drainage. <br />N. Trenches shall be uniform width required for the particular item to be installed, <br />sufficiently wide to provide ample working room. Provide minimum 8 in. <br />clearance on each side of pipe or conduit. <br />1. Excavate trenches to depth indicated or required for indicated flow lines <br />and invert elevations. <br />2. Where rock is encountered, carry excavation 6 in. below scheduled <br />eduled <br />elevation and backfill with a 6 in. layer of crushed stone or gravel prior to <br />installation of pipe. <br />3. For pipes or conduit 5 in. or less, excavate to indicated depths. Hand <br />excavate bottom cut to accurate elevations and support pipe or conduit <br />on undisturbed soil. <br />1 06/07 02221 -7 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.