My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1186
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:30 AM
Creation date
2/28/2008 2:50:29 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1186
Date (mm/dd/yyyy)
12/13/2007
Description
Heritage Park Parking Garage Agrmt w-Spillis Candela ($1,167,400.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Rick Conner <br />November 30, 2007 (Revised December 5, 2007) <br />Page 2 <br /> <br />Task 1 - Conceptual Desion! Site Plan <br /> <br />1: Prepare up to two (2) alternative Concept Schematic Master Site plans and conceptual schematic <br />design massing studies. <br />2: Attend three (3) meetings with City representatives to review master plan and massing studies. <br />3: Preliminary Code review listing appropriate codes <br />4: Prepare the following materials for concept schematic design package: <br />a. Up to two (2) Conceptual Schematic Master Site plans <br />b. Single Line Floor plans <br />c. Front Elevation Sketch <br />d. Elevation massing Sketches <br />e. Architectural renderings (up to two) <br />f. Narrative of Concept schematic design <br />5: Attend up to two (2) meetings with City representatives to review concept schematic design <br />6: Prepare concept schematic design estimate of construction cost <br />7: Update project schedule <br />8: Attend one (1) presentation to the City Commission <br />9: With approval from Owner, proceed to the next phase, update design <br /> <br />Task 2 -Schematic Desi~n <br /> <br />1: Finalize schematic design documentation based upon results of Task 1 for review by using <br />agencies. <br />2: Presentation of schematic design to all agencies for their review. This includes all local permitting <br />agencies for compliance with Life Safety and ADA requirements. <br />3: Prepare the following materials for schematic design package: <br />a. Site plan, indicating location of building, parking area, access road, preliminary storm <br />drainage. <br />b. Landscape plan- preliminary landscape plan <br />c. Floor plans- with general layout and shape of building, includes preliminary life safety <br />plans. <br />d. Elevations of building- depicting all 4 sides of buildings, including preliminary <br />exterior materials <br />e. Typical Building Sections <br />f. Building Systems Descriptions to in estimating costs. <br />g. Architectural renderings (up to two) including 3 dimensional rederings. <br />h. Update project schedule <br />4: Update schematic design estimate of construction cost <br />5: Attend up to two (2) meetings with City representatives to review schematic design. <br />6: With approval from Owner, proceed to the next phase. <br /> <br />SPILUS CANDELA DMJM <br />
The URL can be used to link to this page
Your browser does not support the video tag.