My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1186
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:30 AM
Creation date
2/28/2008 2:50:29 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1186
Date (mm/dd/yyyy)
12/13/2007
Description
Heritage Park Parking Garage Agrmt w-Spillis Candela ($1,167,400.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Rick Conner <br />November 30, 2007 (Revised December 5, 2007) <br />Page 3 <br /> <br />Task 3 - DesiQn Development <br /> <br />5: <br /> <br />Code compliance review and coordination with all permitting agencies. <br />Development of floor plans and building elevations for Owner review and approval. Project <br />engineers develop studies and one line drawings for approval. <br />Attend up to two (2) working meetings with the City representatives <br />Prepare the following materials for inclusion in design development package. (Deliverables) <br />a. Site plans (paving, grading, parking, etc.) <br />b. Floor plans-new city hall and parking on grade <br />c. Enlarged layouts of critical areas <br />d. Building elevations <br />e. Building sections <br />f. Building details/room finish schedules <br />g. Landscape plan <br />h. Preliminary structural drawings <br />i. Preliminary HVAC drawings <br />j. Preliminary plumbing drawings <br />k. Preliminary electrical drawings <br />I. Preliminary security/communications drawings <br />m. Preliminary specifications <br />n. Updated project schedule/phasing plan <br />o. Interior design scheme for facilities on boards with materials shown in color. <br />Prepare DO estimate of construction costs and prepare list of Value Engineering options if <br />required. <br />Design development presentation to the City. <br />With approval from Owner, proceed to contract document phase and update design book. <br /> <br />1 : <br />2: <br /> <br />3. <br />4: <br /> <br />6: <br />7: <br /> <br />Task 4 - Contract Documents <br />Sub Task 4A - 50% Construction Documents <br /> <br />1 : <br />2: <br />3: <br />4: <br />5: <br /> <br />Prepare preliminary calculations for structural, mechanical, and electrical design elements. <br />Prepare 50% set of contract drawings for all disciplines. <br />Prepare technical sections for the specifications. <br />Work with and assist the City staff in preparing the "front ends" to the specifications. <br />Update Statement of Probable Costs. <br /> <br />Sub Task 48 <br />1: <br />2: <br />3: <br />4: <br /> <br />- 100% Construction Documents <br />Prepare final calculations for structural, mechanical, and electrical design elements. <br />Prepare final set of contract drawings for all disciplines. <br />Prepare final technical sections for the specifications. <br />Work with and assist the City staff in preparing the "front ends" to the <br />specifications. <br />Work with CM to prepare final estimate of construction costs. <br />Prepare documents required for submittal to reviewing agencies for issuance of building <br />permit. <br /> <br />5: <br />6: <br /> <br />SPILUS CANDELA DMJM <br />
The URL can be used to link to this page
Your browser does not support the video tag.