<br />Mr. Rick Conner <br />November 30, 2007 (Revised December 5, 2007) <br />Page 3 <br /> <br />Task 3 - DesiQn Development <br /> <br />5: <br /> <br />Code compliance review and coordination with all permitting agencies. <br />Development of floor plans and building elevations for Owner review and approval. Project <br />engineers develop studies and one line drawings for approval. <br />Attend up to two (2) working meetings with the City representatives <br />Prepare the following materials for inclusion in design development package. (Deliverables) <br />a. Site plans (paving, grading, parking, etc.) <br />b. Floor plans-new city hall and parking on grade <br />c. Enlarged layouts of critical areas <br />d. Building elevations <br />e. Building sections <br />f. Building details/room finish schedules <br />g. Landscape plan <br />h. Preliminary structural drawings <br />i. Preliminary HVAC drawings <br />j. Preliminary plumbing drawings <br />k. Preliminary electrical drawings <br />I. Preliminary security/communications drawings <br />m. Preliminary specifications <br />n. Updated project schedule/phasing plan <br />o. Interior design scheme for facilities on boards with materials shown in color. <br />Prepare DO estimate of construction costs and prepare list of Value Engineering options if <br />required. <br />Design development presentation to the City. <br />With approval from Owner, proceed to contract document phase and update design book. <br /> <br />1 : <br />2: <br /> <br />3. <br />4: <br /> <br />6: <br />7: <br /> <br />Task 4 - Contract Documents <br />Sub Task 4A - 50% Construction Documents <br /> <br />1 : <br />2: <br />3: <br />4: <br />5: <br /> <br />Prepare preliminary calculations for structural, mechanical, and electrical design elements. <br />Prepare 50% set of contract drawings for all disciplines. <br />Prepare technical sections for the specifications. <br />Work with and assist the City staff in preparing the "front ends" to the specifications. <br />Update Statement of Probable Costs. <br /> <br />Sub Task 48 <br />1: <br />2: <br />3: <br />4: <br /> <br />- 100% Construction Documents <br />Prepare final calculations for structural, mechanical, and electrical design elements. <br />Prepare final set of contract drawings for all disciplines. <br />Prepare final technical sections for the specifications. <br />Work with and assist the City staff in preparing the "front ends" to the <br />specifications. <br />Work with CM to prepare final estimate of construction costs. <br />Prepare documents required for submittal to reviewing agencies for issuance of building <br />permit. <br /> <br />5: <br />6: <br /> <br />SPILUS CANDELA DMJM <br />