My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:47 PM
Creation date
8/14/2008 11:37:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />13. <br /> <br />The Contractor shall make all necessary arrangements with the utility companies concerned for <br />maintenance of their lines during the construction period. In the event that a complete relocation of <br />utilities is required, but has not been accomplished prior to the effective date of the "Notice to <br />Proceed", the Contractor, nevertheless shall commence work under this Contract, and shall schedule <br />his work to avoid interference with the utility relocation work. <br /> <br />The City of Sunny Isles Beach will not be liable for any delay or added expense the Contractor <br />experiences due to the activities of utility companies, nor shall the City be held responsible for any <br />damages to any utilities due to any actions by the Contractor. <br /> <br />Note: The Contractor shall contact the Underground Utilities Notification Center (1-800-432-4770) <br />and the Underground Notification for Florida Power and Light Company (789-2020) at least forty- <br />eight (48) hours prior to commencing any trenching or excavation on this Project. These telephone <br />numbers are for reference only, it is the contractor's responsibility to verify them and make the <br />necessary contacts with the utility companies prior to commencing his work <br />. <br /> <br />Communitv Small Business Enterprises (CSBE) <br /> <br />A two percent (2.0%) Community Small Business Enterprises (CSBE) Subcontractor Goal has been <br />established for this project. Compliance with this CSBE percentage is required for aJJ contractors <br />submitting a bid for this project. See "Supplemental General Conditions" which are bound herein and <br />are made part of the Specifications and Contract Documents. In order to allow time for the CSBE <br />Subcontractor participation presentation and the review of said presentation, no Contractor may <br />withdraw his bid for a period of up to three hundred (300) calendar days after the bid opening. <br />Disregard anything to the contrary within these Contract Documents. <br /> <br />14. <br /> <br />Pre-Bid Conference: <br /> <br />A Mandatory Pre-Bid Conference will be held as follows: <br /> <br />TIME: <br /> <br />10:00 a.m. <br /> <br />DATE: <br /> <br />PLACE: <br /> <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />Telephone (305) 947-0606 <br /> <br />The Pre-Bid conference is being held primarily to answer any questions regarding this Project and is <br />Mandatory to attend. Bidders that chose not to attend this Mandatory Pre-Bid Conference will be <br />automatically disqualified. <br /> <br />15. <br /> <br />Pre-Construction Conference: <br /> <br />Section 8-3.5 - PRE-CONSTRUCTION CONFERENCE: This Sub article is expanded to include: <br /> <br />After the A ward of Contract and prior to the issuance of the "Notice to Proceed", a Pre-Construction <br />Conference will be held with the Contractor, members of the City"s Public Works Department and <br />other Agencies, representatives of Utility Companies, and other contractors affected by the work. The <br />time and place of this conference will be set by City Manager. <br /> <br />Oct. 2007" Special Provisions <br /> <br />Page 4 of l5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.