My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-04) Landscaping Maintenance Services
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:50 PM
Creation date
8/13/2008 3:01:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Maintenance Services
Bid No. (xx-xx-xx)
07-10-04
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />during the regular servicing and inspection of the City. In areas of traffic, the bid will include all <br />appropriate traffic control devices that conform to an approved Management of Traffic (MOT) <br />plan. All traffic control costs shall be a part of the unit price bid and shall not be paid for <br />separately. <br /> <br />L. GENERAL TECHNICAL SPECIFICATIONS <br /> <br />L1. Accompanying these specifications is a list defining areas to be maintained. By submitting a bid, <br />the bidder certifies that he/she is familiar with the sites and the proposed scope of work, prior to <br />submitting a bid. The City reserves the right to remove specific locations on a temporary or <br />permanent basis, as deemed appropriate. <br /> <br />L2. All equipment shall be maintained in an efficient and safe operating condition while performing <br />work under the contract. Equipment shall have all proper safety devices required by law, properly <br />maintained, and in use at all times. If equipment does not contain proper safety devices and/or <br />is being operated in an unsafe manner, the City may direct the Contractor to remove such <br />equipment and/or the operator until the deficiency is corrected to the satisfaction of the City of <br />Sunny Isles Beach. The Contractor shall be solely responsible and liable for injury to persons, <br />and/or property damage caused by operation of the equipment. All equipment will be inspected <br />and evaluated by the City of Sunny Isles Beach, prior to award of this bid. The following <br />equipment shall be located at the storage satellite facility in the event of emergencies and be <br />available to the City within the reqUired time frames: <br />· FDOT compliant arrow board and 75 FDOT compliant traffic cones. <br />. Backhoe-front end loader <br />. Twenty cubic yard dump truck <br />. Hydraulic 65 foot bucket truck <br />The City, at its sole discretion, may require that any of the special equipment be located in the <br />satellite storaqe site as specified herein. <br /> <br />L3. Special equipment required (in addition to Standard Maintenance Equipment). <br />. One 400 gallon portable water sprayer and one (1) 2500 PSI pressure washer. <br />. FDOT Compliant arrow board and 75 FOOT compliant traffic cones. <br />. Three fertilizer spreaders. <br />· One pull behind aerator, subject to Landscape Architect approval. <br />· Portable Stump Grinder 6" below grade <br />· Underground wiring location equipment <br />· Two hydraulic bucket-trucks with a reach capacity of no less than 65 feet. <br />· One backhoe/front end loader combination machine (equivalent to a Ford F555 or larger.) <br />· One 24 foot minimum vertical man lift (pole cat or equivalent). <br />· Two portable brush chippers with 20 cu yard capacity storage truck. <br />. Two twenty-cubic-yard capacity dump trucks. <br />. One Utility Box Truck or Van. <br />. One portable gasoline generator (5000 W Minimum) <br />· Two 60" three gang hydrostatic reel mowers. (5 blades per reel min.) <br />. One 21" Reel Mower (5 blades) <br />· Four utility carts that can traverse landscaped areas without damaging plants or irrigation. <br />· One Skid-steer Loader with the following accessories: Tree Boom, Fork, Bucket, and Auger. <br />· A two-way communication system between all of the Contractors service vehicles, their <br />main office, and City personnel. <br />The Contractor must own or have leased the followinq eQuipment at the time of bid submittal. <br />The City may reQuire proof of such ownership or lease aqreement at its sole discretion. <br /> <br />L 4. The Contractor must possess the following licenses and keep them current throughout the term <br /> <br />PAGE 51 OF 92 <br />BID No. 07-10-04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.