My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />D. Submit completed Record Documents to the Engineer pnor to or in <br />conjunction with request for Substantial Completion. Prior to final <br />payment, revise Record Documents to show additional information, <br />construction and changes and resubmit to the Engineer. <br /> <br />1.09 TESTING <br /> <br />A. The Contractor shall obtain the services of a professional testing <br />laboratory approved by the Engineer to perform the following type of tests <br />and test frequencies. Copies of all reports are to be sent to the Engineer <br />as soon as possible. <br /> <br />B. Density tests for trench backfill at the rate of three tests per lift in 1,000 <br />feet of trench. <br /> <br />C. Density tests for subgrade compaction at the rate of three test in 1,000 <br />feet of roadway. <br />D. Density tests for limerock base at the rate of three tests per day on each <br />course of completed compacted base. <br /> <br />E. Density tests for roadway crossings at the rate of one test per lane per lift <br />of compacted material, beginning one foot above the normal water table. <br /> <br />F. If in the opinion of the Engineer, suitable compaction has not been <br />achieved around structures, density tests may be required. <br /> <br />G. Concrete compressive strength at the rate of three cylinders per the lesser <br />of 50 cubic yards or per day. <br /> <br />H. Should the above test results indicate deficiencies, the Engineer may <br />order additional tests at the Contractor's expense, and all reworked areas <br />shall be retested at the Contractor's expense. <br /> <br />I. Testing in the County right-of-way shall meet the requirements of Broward <br />County's "Minimum Standards". <br /> <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br /> <br />END OF SECTION <br /> <br />04/08 <br /> <br />01015-5 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.