<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each kev person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE 28
<br /> Lijian Zhou, P.E. Project Manager a. TOTAL b. WITH CURRENT FIRM
<br /> 18 yrs 8 yrs
<br />15. FIRM NAME AND LOCATION (City and State) Langan Engineering & Environmental Services I Miami Lakes, Florida
<br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />University of Florida Master of Engineering in Civil Professional Engineer, State of Florida
<br />Engineering, 1999 (Geotechnical) Troxler Nuclear Moisture-Density Operator Certification
<br />Chengdu University of Science & Technology, Chengdu,
<br />China
<br />Master (1990) and Bachelor (1984) of Engineering in Civil
<br />Engineering (Structural)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> The Four Seasons Hotel & Tower, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> 2003
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm.
<br />a. This development consists of a 66-story high rise hotel, condominium, and office building, a 20-story podium and 6-story garage. Assisted in the
<br /> geotechnical construction aspects of this project to include the following: (A) Full-time inspection of over 100, 6-ft diameter polymer drilled shafts
<br /> with lengths of 110ft to 135 ft. Installation techniques included: 1) uncased drilled shafts stabilized with polymer or bentonite slurry, and 2) cased
<br /> drilled shafts in the upper portions and slurry stabilized in the lower portions; (B) Field inspection of 200, 24-inch diameter, 400-ton piles and full-
<br /> scale compressive, tensile, and lateral load testing of instrumented ACIP piles; (C) Field inspection of tremie sealed sheeted excavations
<br /> (cofferdams) to facilitate dewatering and subsequent placement of cap concrete up to 17 ft below the groundwater table; (D) Intensive tower
<br /> settlement monitoring to verify the settlement performance. (E) Field inspection of footing subgrade preparation and installation of garage slab
<br /> underdrain system to relieve hydrostatic pressure under flood conditions. Cost of work: $1,300.000
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Marina Blue, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> 2007
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm.
<br />Responsibilities included overseeing subsurface investigation, designing, and preparing Geotechnical Engineering Report for the proposed
<br /> 57-story Tower and the surrounding 12-level Podium/Garage. Engineered and oversaw the installation of the deepest 30-inch augercast
<br /> pile yet and the installation of the Osterberg-Cell in an augercast pile for the first time in the USA. Cost of work: $90,000
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Trump International Hotel and Tower, Ft. Lauderdale, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm.
<br />c. Responsibilities included overseeing subsurface investigation, designing, and preparing Geotechnical Engineering Report for the 26-story
<br /> Tower, the surrounding 9-level Podium/Garage and the 4-story retail building. Evaluated and successfully engineered the utilization of
<br /> two different pile lengths to support the tower. Evaluated, coordinated, and assisted in managing all foundation related activities including
<br /> pile load testing, inspections. excavation support, monitoring, dewatering issues, and tower-podium connections; and interaction with the
<br /> owner and the contractor, Cost of work: $180,000
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Dolphin Stadium, Miami Gardens, Florida PROFESSIONAL SERVICES -1 CONSTRUCTION (if applicable)
<br /> On-going
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm.
<br />Designed and oversaw the construction of the foundation aspects of the expansion of the Dolphins Stadium for SuperBowl XXVI. The
<br /> implemented foundation systems consisted of footings on improved soils, high-capacity rock anchors and augered-cast-in-place piles. Cost of
<br /> work: $365,000
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Turnberry Ocean Colony Development, Sunny Isles Beach, Florida PROFESSIONAL SERVICES 1 CONSTRUCTION (if applicable)
<br /> 2007
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm.
<br /> This development consists of twin 38-story towers and a connecting submerged 3-level parking garage. Assisted with the preparation of the
<br /> geotechnical engineering study report for the support of the towers on 420-ton, 24-inch-dia augercast piles and settlement related issues.
<br /> Provided construction oversight and project management during augercast load testing, production pile installation, and sheet pile installation,
<br /> Cost of work: $450.000