My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Spillis Candela DMJM # 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Spillis Candela DMJM # 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 4:57:28 PM
Creation date
8/28/2008 11:21:17 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br /> <br /> <br />. <br /> <br />Fort Lauderdale - Hollywood International Airport <br />Parking Garage <br />Fort Lauderdale, Florida <br /> <br />Spillis Candela DMJM provided complete architectural and <br />engineering design services for a consolidated rental car <br />parking facility at the Fort Lauderdale / Hollywood International <br />Airport. The structure, which includes 12 rental car companies, <br />is a nine-story facility that accommodates 9,000 cars and <br />a full range of rental car concessions and visitor parking. <br />Connections to the terminals are achieved with a pedestrian <br />bridge and a dedicated busway for shuttle buses. The design <br />provides for a future Automated People Mover and an addition of <br />one floor of parking. <br /> <br />Services: Planning, architecture, structural engineering, interior <br />design, construction administration <br /> <br />No. of Cars: 9,000 cars, 9 levels <br /> <br />Southwest Florida International Airport (RSW) <br />Parking Garage <br />Ft. Myers, Florida <br /> <br />The 3.400-car garage for Southwest Florida International Airport <br />consists of three levels and a total of 1,290,000 square feet. <br />Level One of the garage is dedicated to consolidated rental car <br />operations for 1,100 rental cars inclusive of 27,000 square feet <br />for car rental administrative purposes. Levels Two and Three, <br />totaling 2300 cars, are designated for short term public parking. <br /> <br />Spill is Candela DMJM was the lead Design Architect for the <br />Parking Garage which needed to be compatible with the <br />new adjoining 28-gate Midfield Terminal complex for which <br />Spillis Candela DMJM provided comprehensive Architectural, <br />Engineering and Interior Design services. <br /> <br />Services: Architecture, engineering, interior design <br /> <br />No. of Cars: 4,500 cars, 3 levels <br /> <br />Palm Beach International Airport Parking Garage <br />Phases I & II <br />West Palm Beach, Florida <br /> <br />Phase I of this 630,000 square foot, 1 ,834-car parking structure <br />was designed on a fast track basis and completed under <br />budget and on-time. The parking master plan allows for <br />expansion up to 9,000 vehicles. The facility was designed with <br />a precast structural system using concrete panels designed to <br />aesthetically integrate with the new Palm Beach International <br />Airport Terminal Facility. A separate Revenue Control Building, <br />walkways connecting to airport terminals and surface parking for <br />an additional 1 ,000 cars were constructed. Phase II created an <br />additional 3,600 spaces within 7 levels. <br /> <br />Services: Architecture, engineering support <br /> <br />No. of Cars: 2,834 cars, 7 levels <br />
The URL can be used to link to this page
Your browser does not support the video tag.