Laserfiche WebLink
<br />. <br /> <br /> <br />. <br /> <br />THE TEAM RECOMMENDS RELOCATING THE EXISTING DPW FACILITY <br /> <br />c. The constructability of the firm's approach. The MAG team knows <br />how to design parking garages and parks, because it has done this <br />many times before. The MAG team's goal is to produce a cost-effective <br />parking garage and an exciting park. In order to achieve cost-effective <br />construction, the garage should feature pre-cast concrete beams and <br />panels and a rectilinear floor plan. RGD will specify native plant <br />materials to insure durability and low maintenance costs. The MAG <br />team will select building materials for shelters, rest rooms, and other <br />elements to be durable, wind resistant, graffiti resistant, and attractive. <br /> <br />. <br /> <br />Page 6 of 13 <br />