Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br /> <br />12. NAME <br />Ramon Soria, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Principal-in-Charge ~TOTAL <br />23 <br /> <br />14. YEARS EXPERIENCE <br />lb. WitH CURRENHTIill-- <br />15 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Marlin Engineering, Inc. <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />Bachelor of Science in Civil Engineering, <br />University of Miami, Coral Gables, Florida <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />1984 State of Florida Professional Engineer #41218, 1989 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards, etc.) <br />Civil Engineering Honor Society (Chi-Epsilon) <br />American Society of Civil Engineers <br /> <br />19. RELEVANT PROJECTS <br /> <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />NW 25th Street PD&E, FOOT District 6, Miami, FL PROFESSIONAL SERVICES-I CONSTRUCTION (lfapplicable) <br /> <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE xj Check if project performed with current firm <br />a. As Project Manager and Principal-in-Charge, Mr. Soria was responsible for the Project Development and Environmental Study of this <br />principal arterial servicing Miami International Airport cargo facilities. Apart from the normal technical activities associated with the study <br />such as, preparing corridor studies. traffic reports, master plans, engineering reports, and preliminary alignment design, Mr. Soria also <br />directed public workshops and other numerous public and agency meetings. <br /> <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Coral Gables Traffic Calming, Coral Gables, Florida PROFESSIONAL SERVICES I CONSTRUCTION (tfapplicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l>< I Check if project performed with current firm <br />b. As the Project manager for this Citywide Traffic Calming Project, Mr. Soria organized numerous Public <br />Meetings in which he spoke to hundreds of residents to be able to better analyze existing problems on city <br />streets. He oversaw the development of the data collection, analysis and recommendations to improve <br />liability conditions within the city. Mr. Soria was able to bring a community together with respect to traffic <br /> <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Public Transportation Consultant - Rail, FDOT District 6, Miami, PROFESSIONAL SERVICES !CONSTRUCTION (If applicable) <br />Florida <br />(3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) ANO SPECIFIC ROLE ~ I Check if project performed with current firm <br />c. C-J <br />Mr. Soria was Principal-in-Charge and Project Manager. Mr. Soria was the point of contact for the <br />Department and Marlin Engineering, Inc. This Project was composed of the development of numerous work <br />orders such as, traffic control plans for surface crossing rehabilitation, RHCI, preparing diagnostic sketches, <br />inspecting park and ride lost, performing closure studies, and other miscellaneous tasks associated with the <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> <br /> <br />U Check if project performed with current firm <br /> <br />(3) BRIEF OESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE <br /> <br />d. <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> <br /> <br />U Check if project performed with current firm <br /> <br />(3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE <br /> <br />e. <br /> <br />STANDARD FORM 330 (612004) PAGE 2 <br />