Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br /> <br />- <br /> <br />12. NAME <br />Sergio Alfonso, Jr., P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Quality Control Officer a. TOTAL <br />30 <br /> <br />14. YEARS EXPERIENCE <br />lb. WITH CURRENT-F~ <br />15 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Marlin Engineering, Inc. <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S.C.E.T. Florida International University, 1980 <br />A.S., Miami Dade Community College, 1972 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />State of Florida Professional Engineer # 32518, 1982 <br />State of California Professional Engineer # 35883, 1983 <br />State of North Carolina Professional Engineer # 14603, 1988 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc.) <br />Traffic Control Plans - FDOT; Highway Capacity Workshop - Northwestern University; Traffic Signal Workshop - Northwestern University; <br />Statistical Quality Control- FDOT; Highway User Cost Evaluation - FHWA. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED <br /> SR A-1-A RRR Project, Indian River County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE lxJ Check if project performed with current firm <br />Quality Control Engineer, and was responsible for the overall quality control of all design activities. This project embraced seven miles <br /> of major arterial in Indian River County, included development of Resurfacing, Restoration and Rehabilitation (RRR) Report. Extensive <br /> private driveway coordination. Roadway and signing & pavement marking, utility coordination, design and plan preparation for traffic <br /> monitoring equipment, including sensors and its equipment for one PTMS site. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 84 and Paradise Way, Broward County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If appticable) <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ J Check if project performed with current firm <br />b. Quality Control Engineer, and was responsible for the overall quality control of all design activities. This <br /> project encompassed the design of an exclusive right turn lane, drainage, utility coordination, signing and <br /> pavement marking. <br /> (1) TITLE AND LOCATION (City and Stafe) (2) YEAR COMPLETED <br /> NW 25th Street, Final Roadway Design, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If appticable) <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />c. Mr. Alfonso is the Quality Control Engineer responsible for the overall quality control of all design activities. <br /> This is a two mile urban arterial at grade, also including a direct viaduct connector between west of SR 826 <br /> and the Miami International Airport West Cargo Area. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 826 Connector Ramp at Golden Glades Interchange, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br />d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Mr. Alfonso was the Quality Control Engineer, and was responsible for the overall quality control of all design operations. His significant <br /> professional expertise contributed to the production of a high quality project by reviewing all documents prior to each submittal, following <br /> specific procedures. Mr. Alfonso checked the roadway design; signing and pavement marking plan for accuracy, adequacy, legibility and <br /> clarity of presentation. His review comments were referred to project management for corrections or responses, to integrate <br /> management and production efforts and obtain a quality final product satisfactory to FOOT. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 80 (Southern Blvd.) from West of Haverhi// Road to Parker PROFESSIONAL SERVICES I CONSTRUCTION (If aoplicable) <br /> Avenue, Palm Beach County, FL <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Quality Control Engineer, and was responsible for the overall quality control of design and plan preparation <br /> activities. This project embraced four miles of roadway reconstruction for a major highway in Palm Beach <br /> County, included lighting justification report, lighting design, signing and pavement marking. Design and plan <br /> preparation for traffic monitoring equipment, including sensors and its equipment for one PTMS site. <br /> <br />STANDARD FORM 330 (612004) PAGE 2 <br />