|
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />o
<br />
<br />-
<br />
<br />12. NAME
<br />Sergio Alfonso, Jr., P.E.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />Quality Control Officer a. TOTAL
<br />30
<br />
<br />14. YEARS EXPERIENCE
<br />lb. WITH CURRENT-F~
<br />15
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Marlin Engineering, Inc.
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S.C.E.T. Florida International University, 1980
<br />A.S., Miami Dade Community College, 1972
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />State of Florida Professional Engineer # 32518, 1982
<br />State of California Professional Engineer # 35883, 1983
<br />State of North Carolina Professional Engineer # 14603, 1988
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc.)
<br />Traffic Control Plans - FDOT; Highway Capacity Workshop - Northwestern University; Traffic Signal Workshop - Northwestern University;
<br />Statistical Quality Control- FDOT; Highway User Cost Evaluation - FHWA.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
<br /> SR A-1-A RRR Project, Indian River County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE lxJ Check if project performed with current firm
<br />Quality Control Engineer, and was responsible for the overall quality control of all design activities. This project embraced seven miles
<br /> of major arterial in Indian River County, included development of Resurfacing, Restoration and Rehabilitation (RRR) Report. Extensive
<br /> private driveway coordination. Roadway and signing & pavement marking, utility coordination, design and plan preparation for traffic
<br /> monitoring equipment, including sensors and its equipment for one PTMS site.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR 84 and Paradise Way, Broward County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If appticable)
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ J Check if project performed with current firm
<br />b. Quality Control Engineer, and was responsible for the overall quality control of all design activities. This
<br /> project encompassed the design of an exclusive right turn lane, drainage, utility coordination, signing and
<br /> pavement marking.
<br /> (1) TITLE AND LOCATION (City and Stafe) (2) YEAR COMPLETED
<br /> NW 25th Street, Final Roadway Design, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If appticable)
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />c. Mr. Alfonso is the Quality Control Engineer responsible for the overall quality control of all design activities.
<br /> This is a two mile urban arterial at grade, also including a direct viaduct connector between west of SR 826
<br /> and the Miami International Airport West Cargo Area.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR 826 Connector Ramp at Golden Glades Interchange, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br />d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Mr. Alfonso was the Quality Control Engineer, and was responsible for the overall quality control of all design operations. His significant
<br /> professional expertise contributed to the production of a high quality project by reviewing all documents prior to each submittal, following
<br /> specific procedures. Mr. Alfonso checked the roadway design; signing and pavement marking plan for accuracy, adequacy, legibility and
<br /> clarity of presentation. His review comments were referred to project management for corrections or responses, to integrate
<br /> management and production efforts and obtain a quality final product satisfactory to FOOT.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR 80 (Southern Blvd.) from West of Haverhi// Road to Parker PROFESSIONAL SERVICES I CONSTRUCTION (If aoplicable)
<br /> Avenue, Palm Beach County, FL
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Quality Control Engineer, and was responsible for the overall quality control of design and plan preparation
<br /> activities. This project embraced four miles of roadway reconstruction for a major highway in Palm Beach
<br /> County, included lighting justification report, lighting design, signing and pavement marking. Design and plan
<br /> preparation for traffic monitoring equipment, including sensors and its equipment for one PTMS site.
<br />
<br />STANDARD FORM 330 (612004) PAGE 2
<br />
|