Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br /> <br />12. NAME <br />Miguel Soria, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Senior Project Engineer I a. TOTAL <br />Constructibility 15 <br /> <br />14. YEARS EXPERIENCE <br />lb. WITH CURRENT FIRM <br />10 <br /> <br />15. FIRM NAME ANO LOCATION (CIty and State) <br />Marlin Engineering, Inc., Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALllA TION) <br />Bachelor of Science in Civil Engineering <br />University of Miami, Coral Gables, Florida <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />State of Florida Professional Engineer , Registration # <br />49359 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training. Awards, elc) <br />Traffic Control TC-M-A 22879162 <br />Value Engineering CUS#840603 <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (Cily and Stale) (2) YEAR COMPLETED <br /> NW 25 Street, Final Roadway Design, Miami-Dade County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 1999 TBD <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cosl, etc) AND SPECIFIC ROLE Ix..J Check if project performed with current firm <br />a. Design Project Manager responsible for the management of this major urban reconstruction project. The design work <br /> included but not limited to the horizontal and vertical geometry of NW 25th Street and the overhead viaduct from NW 87th <br /> Avenue to NW 67th Avenue. Mr. Soria managed construction plans for the various elements of this major highway project <br /> such as drainage, profiles, alignments, cross sections, and traffic control plans according to federal, state, and local <br /> standards and guidelines. Mr. Soria also assisted the Department's project manager in the coordination between all <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR A-1-A (Indian Creek Drive) Roadway Reconstruction, Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> County, Florida 2004 2007 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ I Check if project performed with current firm <br />Project Manager responsible for the management of this urban reconstruction project. Mr. Soria managed the design <br /> and plans production for all areas of the project such as the horizontal and vertical alignment, roadway plans, signing and <br /> pavement markings, signalization, and lighting. <br /> FOOT Project Manager: Dennis Fernandez (305) 470-5569. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR A-1-A (Ocean Drive) Lighting and Signalization, Broward County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Florida 2003 2002 <br /> (3) BRIEF OESCRIPTION (Brief scope, size, cost, ete) AND SPECIFIC ROLE l2lJ Check if project performed with current firm <br />c. Project Manager responsible for the management of the design and plans production for signalization and decorative <br /> lighting along SR A 1A in the City of Lauderdale by the Sea for FOOT District 4. <br /> FOOT Project Manager: Jose Velarde (954) 777-4677. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 1-95 HOV from North Lake Boulevard to PGA Boulevard, Palm Beach PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> County, Florida 2002 TBD <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />d. This project embraced five miles of high occupancy vehicle (HOV) lane for interstate highway in Palm Beach county, <br /> included lighting justification report, lighting design, signing and pavement marking, including signing for general motorist <br /> services. This project also required the coordination with various state and local agencies. Sub-consultant FOOT District <br /> Four Project Manager: John Thompson, P.E. (954) 486-1400. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR-826 Connector Ramp at Golden Glades Interchange, Miami-Dade PROFESSIONAL SERVICES. 1 CONSTRUCTION (If applicable) <br /> County, Florida 2000 2002 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc) AND SPECIFIC ROLE 1(J Check if project performed with current firm <br />Mr. Soria was the Project Manager, & was responsible for the management of all design operations. The roadway design, <br /> signing & pavement marking plan proved to be a challenge due to the complexity in its profiles were a balance of existing <br /> and proposed geometry needed to be precise. His management skill directed this project towards a positive outcome to <br /> the Department. Mr. Soria was responsible guidance for post design services of this roadway project during construction. <br /> Mr. Soria provided the contractor, via the FOOT construction resident engineer, plans clarifications and alternative <br /> <br />STANDARD FORM 330 (612004) PAGE 3 <br />