Laserfiche WebLink
<br />has been issued. Prior to the issuance of a building permit the applicant <br />shall provide a copy of the approved site plan, on disc, in a format <br />compatible with the City's engineering applications. <br /> <br />508.11 Mylar Copy of J\pproved Site Plans Required. Following City sign off, but <br />prior to the issuance of a building permit, a Mylar copy of the approved site <br />plan shall be submitted to the Department of Zoning, Planning and <br />Building. The Mylar shall be in the same scale and identical to the <br />approved site plan. <br /> <br />508.12 Conformance with Ap,proved Site Plans. Prior to the issuance of a <br />Certificate of Occupancy, two as-buih surveys shall be submitted to the <br />Department of Zoning, Planning and Building. The as-built surveys shall <br />be in the same scale as the approved site plan Mylar. In case of any <br />conflicts the approved site plan shall prevail. <br /> <br />City of Sunny Isles Beach-Land Development Regulations <br />Adopted December 10, 2002 <br /> <br />CHAPTER 5 - Development Review 500-31 <br />