<br />
<br />proof shutters to new glaze opening; addition of a metal stairs communicating the parking area and the
<br />fourth floor; replacement and modifications of existing building's communication and emergency power
<br />systems; upgrading building's emergency fire protection systems, emergency lighting and alarm sys-
<br />tem; installation of telephone conduit system to support emergency operations and provide new building
<br />lightning protection system; enclosure of existing two (2) story museum space by expanding the existing
<br />mezzanine level with a structural floor system (fourth floor); remove existing spiral staircase in the SW
<br />corner of the museum and provide necessary means of egress; provide break-out/office rooms in new
<br />floor area; provide communications, power and data to Command Center and areas identified by the
<br />Emergency Management Coordinator; Installation of a new card reader/ parking lot security system in
<br />two points; replace entire HVAC system creating a 5th floor Pent-house to house new systems.
<br />
<br />Miscellaneous Professional Service Agreement, R-1292-89,1989-1991 For Miami-Dade County
<br />Aviation Department, Miami, FL- Principal-in-Charge: List of Service Orders under this PSA: Proposed
<br />Snack Bar at 'E' Satellite, MIAD Cargo Building 2142 Renovations,Terminal North 4th Floor Improve-
<br />ments, Park 8 Bus Station Shelter MCC-2-88, MIAD Cargo Building Study, Airline Relocation Concourse
<br />'B', 'C', 'F', Concourse 'c' Loading Bridges, Eat N Fly Snack Bar, B/C Modification ofTicket Counters,
<br />Concourse 'c' Loading Bridges, Miscellaneous Airline Relocation Concourses E-F, West Gate Tempo-
<br />rary Shelter, MIA-In- Transit Lounges (Phase I), Terminal Wide Airline & Finishes, Cargo Building 2130
<br />& 2134, Terminal Wide Airline & Finishes, Study/LCD Signage Program, U.S. Customs Offices & K-9
<br />Area,and Passenger Loading Bridges G2, G4, G6, B12.
<br />
<br />Miscellaneous Professional Service Agreement, R.652-92, 1992-1994 For Miami-Dade County
<br />Aviation Department, Miami, FL- Principal-in-Charge: List of Service Orders under this PSA: Cargo
<br />Clearance Center (CCC) Customs Refurbishment - Phase II, Miscellaneous Interior Improvements,
<br />Concourse 'G' Throat Food Service & Cocktail, GSA Renovations - Building 100, Concourse 'E' Child
<br />Stage Area,Temporary Parking Design at CCC, Sign Package for CCC-192 Cargo Building, Terminal
<br />North 4th Floor Improvements Phase 5, Terminal Wide & Finishes (Packages 6&7), CCC-192 Cargo
<br />Buildings Colors, 'G' Throat Food Service (Program), Concourse 'E' Playground, Interim Commuter
<br />Terminal (MCC) and CCC-1-192 Cargo Buildings Construction Program.
<br />
<br />Black Creek Park at the Hammocks, Miami, FL - Principal-in-charge: Overall coordination of design
<br />development to project completion of new $750,000 community center and pools. Scope of project
<br />included a new community recreational center with functioning kitchen, two pools and a sunning deck.
<br />Program also required integrating existing basketball/racquetball/tennis courts to new center with ex-
<br />tensive landscape architecture.
<br />
<br />Wildlime Park at the Hammocks, Miami, FL - Principal-in-charge: Design development, documenta-
<br />tion and project management of a $1,200,000 recreation center with adjoining pools. Project included
<br />new community center with pools and sun deck along with extensive landscape planning to integrate
<br />existing outdoor facilities.
<br />
<br />West Kendall District Dog Park, Miami, FL - Principal-in-charge: Overall coordination of 560 SF, one
<br />story masonry restroom and parking lot facility for the West Kendall Dog park. The Dog park houses
<br />two separate fenced areas with circular walkways and a center open-landscape area to allow your pet
<br />to play free with other dogs. The two areas will allow owners to walk their dogs with other dogs similar
<br />in size.
<br />
<br />.~,~
<br />
<br />Pembroke Pines Chapel Trail Master Plan, Pernbroke Pines, FL - Principal-in-charge: Responsible
<br />for the master plan of 54-acre site which included a charter school, a storage building, a warehouse/
<br />office complex, a shopping center, a community park and 110 town homes.
<br />
<br />Homestead Bayfront Park Harbor Master Building, Homestead, FL - Principal-in-charge: Overall
<br />coordination to project completion of new Harbor Master Building.The ground level is composed of a
<br />
<br />Counted Pages 5 of 10
<br />
<br />Total Document 6 of 50
<br />
|