My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Borges & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
Borges & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 10:27:36 AM
Creation date
11/10/2010 10:27:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural Services
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,.' <br /> <br /> <br />- <br /> <br /> <br />Field Observations and Investigation: Visual on-site non destructive review of the project site, including but not limited to <br />physical condition of the site, existing on site structure to be demolished, field measurements, digital recording (photos) etc. <br /> <br />Schematic Design: Review all data furnished including design program, budget, legal, site, code space and special owner <br />requirements. Prepare functional space plans, basic sections and elevations. Analyze comparative systems with engineers and <br />consultants. Select systems to be used. Determine system space and location requirements. <br /> <br />Design Development: Review unresolved issues on schematic design, Confer with and obtain preliminary review from <br />regulatory agencies, Coordinate with mechanical and electrical engineers the result of meetings with the utility companies, <br />Coordinate with consultants and review the results of all investigations and tests including soil boring and analysis, <br /> <br />Construction Documents: Review unresolved issues on design development, As documents develop, confer with and obtain <br />further review from regulatory agencies, Coordinate the work of all team members, including consultants, Complete all <br />schedules including door, window, finishes and wall types, Monitor approval and permit process, Coordinate with consultants <br />and revise documents as required, Incorporate materials, equipment, finishes etc to the construction documents to comply with <br />LEED requirements, up load required documents as needed by the USGBC and GBCI to obtain LEED certification. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. 1.FIRM NAME <br />Borges + Associates, P.A. <br /> <br />2. FIRM LOCATION (City and State) <br />Hagerstown, MD <br /> <br />3. ROLE <br />Prime Architect and <br />Oversaw Enaineerina <br /> <br />STANDARD FORM 330 (6/2004) PAGE 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.