Laserfiche WebLink
<br />111 <br /> <br />barges + <br /> <br />rl r) son ri1 P') <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency. or to projects. if not specified <br />Complete one Section F for each project) <br /> <br />20. EXAl~PLE <br />NUMBER <br /> <br />2 <br /> <br />21. TITLE AND LOCA nON (City and State) <br />Susquehanna Interior Design, Hagerstown, MD <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAl SERVICES CONSTRU cnON (H applicable) <br />2008 2010 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Ghattas Enterprise <br /> <br />b. POINT OF CONTACT NAME <br />Asad Ghattas <br /> <br />C. POINT OF CONTACT TELEPHONE <br />NUMBER <br />301 797-2488 <br /> <br />24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (IncJudescope, size, and cost) <br />Construction Administration: Monitor contractor's LEED submittals and up load required documents as needed by the USGBC <br />and GBCI to obtain LEED certification, Obtain and review required test reports, Keep owner informed of work progress, prepare <br />and submit field reports, Receive review and respond to Contractor's applications for payment, Receive and review <br />Contractor's submittals and shop drawings for compliance with contract documents, Review and recommend actions on contractor's <br />change orders, <br /> <br />These new offices are designed to meet LEED Silver certification, The State of the Art facility is furnished with Steel Case Furniture and <br />Standard Privacy Wall System. Borges + Associates specified all furniture for entire facility, assisted in transition planning with Bank <br />President and Management Leaders to ensure a smooth transition from Concept to Move-in. The Borges team coordinated all MEP <br />engineering and performed as Interior Architects selecting all finishes, designed all fixed furnishing, selected all lighting systems and <br />coordinated to meet all of the Bank's Design Standards. The 22,969 s/f Bank Offices have replaced their original headquarter offices in <br />Downtown Hagerstown and will continue to build on the Bank's Brand thought the region with its expansion program in Pennsylvania and <br />Maryland. Borges provided full service during bidding and construction to ensure full compliance with design documents and a smooth <br />construction process and move-in. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. 1. FIRM NAME <br />Borges + Associates, P .A. <br /> <br />2. FIRM LOCA nON (City and State) <br />Hagerstown, MD <br /> <br /> <br />STANDARD FORM 330 (6/2004) PAGE 12 <br />