My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BEA Architects
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
BEA Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 11:21:21 AM
Creation date
11/10/2010 11:21:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project,) <br />21. TITLE AND LOCATION (City and State) <br />Professional Architectural & Engineering Services, <br />Miami Gardens, Fl <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />4 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2007 2007 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305.622.8033 <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME <br />City of Miami Gardens Ms. Antranette Pierre <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Landscape layout and design, color selection and coordination <br /> <br />A total of eight parks in the City of Miami Gardens were upgraded. The parks include Andover, Brentwood, Buccaneer, Cloverleaf, North <br />Dade Optimist Park, lake Lucerne, Vista Verde, and Norwood Park & Pool. Covering a total of 40 acres, master plans for each park <br />were prepared. Improvements included designs for clubhouses, infrastructure, parking lots, athletic fields, landscaping and lighting. <br />Project Construction Cost $4M <br /> <br />1I111i.ul.llie- <br /> <br />- ------, <br /> <br /> <br />, <br /> <br /> <br />-~ - - <br />, .. <br />~ ~, <br />I' , I <br />, ,) <br />.' ' <br />. ~ <br />. ' /, .. <br /> <br />Key Personnel: John Colao, AlA, GC <br />Robert Draper <br /> <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />(3) ROLE <br /> <br />a. <br /> <br />BEA architects, Inc. <br /> <br />Miami, FL <br /> <br />Masterplan <br /> <br />RFQ #10-04-02 Professional Architectural Services I 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.