Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />12. NAME <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br /> <br />Elvira C. Freire, AlA, LEED AP <br /> <br />Project Architect <br /> <br />15 15 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Corzo Castella Carballo Thompson Salman, P.A. (C3TS) - Coral Gables, Florida <br /> <br />16. EOUCATION (DEGREE AND SPECIALIZATION) <br /> <br />Bachelor of Architecture <br />University of Miami, Miami, Florida 1995 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />State of Florida Registered Architect No. 95213 <br />LEED Accredited Professional <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Coral Springs Public Safety Training and Technology Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Coral Springs, Florida 2006 2007 <br /> (3) BRIEF DESCRIPTION (Brief Scope, size, cost. etc.) AND SPECIFIC ROLE o Check if proiect perfonned with current Finn <br />a. Architectural Designer / Project Manager for the Coral Springs Fire Academy, Police and Fire Administration Offices and Technology Room on a 3.9 <br /> acre site adjacent to the City's Vehicle Maintenance and Public Works Center. The project includes 3 large apparatus training bays; 5 training rooms <br /> seating 40 persons and 4 rooms seating 10 people; instructors' officers; library; computer lab, medical technical training facilities; locker/dressing <br /> rooms; toilets and other spaces. The gross area of the Training build will be approximately 22,000 S.F. In addition, there is to be a multi-story tower; <br /> burn pits' vehicle fire facilities; a combined police and fire six story rescue building and roadways with multiple fire hydrant connections in future <br /> ohases. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Beach Restrooms & Concession Stands PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Miami Beach, Florida 2007 2008 <br />b. (3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project perfonned with current Finn <br />Project Architect for these facilities which designed these restroom and concession facilities in response to the Arts in Public Places Committees <br /> requirements' to expend funds at these locations. C3TS was extremely proud to have been selected, together with Tran Construction, to provide <br /> these much needed facilities on a design-build basis. Each street head (21st, 35th, 46th, and 64th) will act as location markers and be each visually <br /> distinctive from the other in order to promote way-finding along the beach as well as provide a level of whimsy to what has been traditionally a very <br /> dour oroaram. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> North Dade Maintenance Facility Phase I,ll & III, (Office Building, Truck PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Maintenance & Warehouse Building, and Office Building and Maintenance 2005 2006 <br /> Buildinal FOOT District 6 <br /> (3) BRIEF DESCRIPTION (Brief Scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project perfonned with current Finn <br />c. Project Architect for the Design/Build of FOOT District 6 North Dade Maintenance Facility. Phase I included a 12,000 sq. ft. office building. The <br /> facility included offices; conference and training rooms; lunch room with a kitchenette and vending machines; locker facilities with showers and <br /> toilets; and computer / radio communication rooms. An emergency generator was also provided. Phase II included an 18,000 sq. ft. eight-bay <br /> vehicle maintenance / warehouse building; roofing of a four-station fueling facility; bulk and secure material storage; and site development of the 8.3 <br /> acre parcel. For Phase III C3TS provided contract documents for the design/build project of a 5,000 sq. ft. office. This facility consists of offices and <br /> conference room for the FOOT Construction Department. A 600 SQ. ft. weldinQ shop and restroom facility was also provided under this ohase. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Oakes Road Fire Rescue Station PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Davie, Florida 2006 2007 <br />d. (3) BRIEF DESCRIPTION (Brief Scope, size. cost, etc.) AND SPECIFIC ROLE o Check if project perfonned with current Finn <br /> Architectural Designer selected by the Town of Davie to provide design services for the Oakes Road Fire/Rescue Station. The 2 story, 15,000 S.F. <br /> Station is located on a 1.3 acre site adjacent to SR-7. The project includes 3 large apparatus bays, offices, day room, kitchen, fitness room and <br /> sleeping quarters for the Fire/Rescue personnel. This station is sited in the eastem / industrial part of the town, and architecture of the building <br /> reflects a more industrial character. The 3-storv tower is servina as a beacon for the station and its surroundings. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br /> <br />STANDARD FORM 330 (6/2004) <br />