|
<br />,-
<br />
<br />. " ' , -
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />
<br /> 14, YEARS EXPERIENCE
<br />12, NAME 13, ROLE IN THIS CONTRACT a, TOTAL b, WITH CURRENT FIRM
<br />Wesley A. Castellanos, AI Architectural Designer 9 3
<br />
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Corzo Castella Carballo Thompson Salman, P.A. (C3TS) - Coral Gables, Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />Bachelor of Science in Architecture, Institute of Technology, School of
<br />Architecture, New York, 2000
<br />Master of Arts in Architecture, Scuola di Architecttura, Florence, Italy 2001
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards, etc.)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Library Windows Replacement at Florida International University PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Biscayne Bay Campus, North Miami, Florida 2008 2009
<br />a. (3) BRIEF DESCRIPTION (Brief Scope, size. cost. etc.) AND SPECIFIC ROLE It! Check if proiect perfonned with current finn
<br /> Project Manager and Architectural Designer for this project that was implemented for the replacement of the existing ground floor windows at the
<br /> Biscayne Bay Campus library. Water infiltration and overall life span had caused the replacement to be needed. Since the objective of the project
<br /> was to provide high impact resistance for the building, the new windows will be of a higher quality.
<br /> (1) TITLE ANO LOCATION (City and State) (2) YEAR COMPLETED
<br /> Wolfe Center 3rd Floor Renovation at Florida International University PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Biscayne Bay Campus, North Miami, Florida 2008 2009
<br />b. (3) BRIEF DESCRIPTION (Brief Scope. size. cost, etc.) AND SPECIFIC ROLE It! Check if project perfonned with current finn
<br /> Project Manager and Architectural Designer responsible for providing space planning, design and construction administration for the students'
<br /> government and wellness center administration offices.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Uleta Community Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> North Miami Beach, Florida 2010 On-going
<br />c. (3) BRIEF DESCRIPTION (Brief Scope. size. cost, etc.) AND SPECIFIC ROLE It! Check if project perfonned with current finn
<br /> Architectural Designer for the redesign of a five-acre site. Mr. Castellanos will oversee the demolition of two existing structures and two new pools to
<br /> be constructed into three phases. The project will be complete with a restored gymnasium, children's classes, offices, and pool building with an
<br /> enclosed glass corridor connecting each space. The site will provide the client with an increased income and educational facility.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> South ridge Aquatic and Community Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Miami, Florida 2007 N/A
<br /> (3) BRIEF DESCRIPTION (Brief Scope. size, cost, etc.) AND SPECIFIC ROLE It! Check if proiect perfonned with current finn
<br />d. C3TS was/is in charge of all programming and architectural design of this 8,000 S.F. community and aquatic center at a 5.5 acre park. The aquatic
<br />facility includes a 25 X 25 M competition pool with diving sell, aquatic exercise pool and children's water play pool. This new complex includes three
<br /> Little League baseball fields, one mixed-use field for adult softball/pony baseball/softball, and one football/soccer field with a perimeter running track.
<br /> Along with the fields, C3TS designed a two-story baseball pavilion which offers a snack bar/concession area and an announcer's booth and a one-
<br /> story football pavilion which provides players with restrooms, weigh-in room, storage and observation deck. The site also features a 50-meter
<br /> competitive swimming pool with zero-depth entry at one point, where school children will receive weekly swimming lessons. Also included in the pool
<br /> buildinq are restrooms, locker rooms, offices, and a meetinq room.
<br />
<br />AUTHORIZED FOR LOCAL REPRODUCTION
<br />
<br />STANDARD FORM 330 (6/2004)
<br />
|