Laserfiche WebLink
<br />,- <br /> <br />. " ' , - <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br /> 14, YEARS EXPERIENCE <br />12, NAME 13, ROLE IN THIS CONTRACT a, TOTAL b, WITH CURRENT FIRM <br />Wesley A. Castellanos, AI Architectural Designer 9 3 <br /> <br />15, FIRM NAME AND LOCATION (City and State) <br />Corzo Castella Carballo Thompson Salman, P.A. (C3TS) - Coral Gables, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />Bachelor of Science in Architecture, Institute of Technology, School of <br />Architecture, New York, 2000 <br />Master of Arts in Architecture, Scuola di Architecttura, Florence, Italy 2001 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Library Windows Replacement at Florida International University PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Biscayne Bay Campus, North Miami, Florida 2008 2009 <br />a. (3) BRIEF DESCRIPTION (Brief Scope, size. cost. etc.) AND SPECIFIC ROLE It! Check if proiect perfonned with current finn <br /> Project Manager and Architectural Designer for this project that was implemented for the replacement of the existing ground floor windows at the <br /> Biscayne Bay Campus library. Water infiltration and overall life span had caused the replacement to be needed. Since the objective of the project <br /> was to provide high impact resistance for the building, the new windows will be of a higher quality. <br /> (1) TITLE ANO LOCATION (City and State) (2) YEAR COMPLETED <br /> Wolfe Center 3rd Floor Renovation at Florida International University PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Biscayne Bay Campus, North Miami, Florida 2008 2009 <br />b. (3) BRIEF DESCRIPTION (Brief Scope. size. cost, etc.) AND SPECIFIC ROLE It! Check if project perfonned with current finn <br /> Project Manager and Architectural Designer responsible for providing space planning, design and construction administration for the students' <br /> government and wellness center administration offices. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Uleta Community Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> North Miami Beach, Florida 2010 On-going <br />c. (3) BRIEF DESCRIPTION (Brief Scope. size. cost, etc.) AND SPECIFIC ROLE It! Check if project perfonned with current finn <br /> Architectural Designer for the redesign of a five-acre site. Mr. Castellanos will oversee the demolition of two existing structures and two new pools to <br /> be constructed into three phases. The project will be complete with a restored gymnasium, children's classes, offices, and pool building with an <br /> enclosed glass corridor connecting each space. The site will provide the client with an increased income and educational facility. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> South ridge Aquatic and Community Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Miami, Florida 2007 N/A <br /> (3) BRIEF DESCRIPTION (Brief Scope. size, cost, etc.) AND SPECIFIC ROLE It! Check if proiect perfonned with current finn <br />d. C3TS was/is in charge of all programming and architectural design of this 8,000 S.F. community and aquatic center at a 5.5 acre park. The aquatic <br />facility includes a 25 X 25 M competition pool with diving sell, aquatic exercise pool and children's water play pool. This new complex includes three <br /> Little League baseball fields, one mixed-use field for adult softball/pony baseball/softball, and one football/soccer field with a perimeter running track. <br /> Along with the fields, C3TS designed a two-story baseball pavilion which offers a snack bar/concession area and an announcer's booth and a one- <br /> story football pavilion which provides players with restrooms, weigh-in room, storage and observation deck. The site also features a 50-meter <br /> competitive swimming pool with zero-depth entry at one point, where school children will receive weekly swimming lessons. Also included in the pool <br /> buildinq are restrooms, locker rooms, offices, and a meetinq room. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br /> <br />STANDARD FORM 330 (6/2004) <br />