My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C3TS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
C3TS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 11:39:50 AM
Creation date
11/10/2010 11:39:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br /> 14. YEARS EXPERIENCE <br />12. NAME 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM <br />Eleane M. Navarro, AI, LEED AP Architectural Designer 14 14 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Corzo Castella Carballo Thompson Salman, P.A. (C3TS) - Coral Gables, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />Bachelor of Architecture <br />Syracuse University, 1994 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />LEED Accredited Professional <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />.19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Renovations & Addition to lauderhill Fire Station No. 57 PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> lauderhill. Florida 2003 2005 <br /> (3) BRIEF DESCRIPTION (Brief Scope. size. cost, etc.) AND SPECIFIC ROLE 0" Check if project perfonned with current finn <br />a. C3TS was retained by the City of Lauderhill Fire Department to provide Architectural & Engineering services to renovate an existing three story <br /> former Police Headquarters building adjacent to Fire Station NO.57 and design a new building to connect the two existing buildings. The new building <br /> houses two apparatus bays. The ground floor of the existing three story building houses the quarters for the Fire-Rescue personnel. The second floor <br /> contains the City of Lauderhill's Emergency Operations Center and Fire-Rescue Training Facilities. The third floor provides space for the Fire <br /> Administrations and Fire Marshal's offices. Construction cost was $1.8 million dollars, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Coral Springs Public Safety Training and Technology Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Coral Springs, Florida 2006 2007 <br />b. (3) BRIEF DESCRIPTION (Brief Scope. size. cost, etc.) AND SPECIFIC ROLE 0" Check if project perfonned with current finn <br /> Assistant Project Manager for this project on a 3.9 acre site adjacent to the City's Vehicle Maintenance and Public Works Center. The project <br /> includes three large apparatus training bays; five training rooms seating 40 persons and four rooms seating 10 people; instructors' officers; library; <br /> computer lab, medical technical training facilities; locker/dressing rooms; toilets and other spaces. In addition, there is a multi-story tower; burn pits; <br /> vehicle fire facilities; a combined police and fire six-story rescue buildina; and roadwavs with multiole fire hvdrant connections. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Norwood Oettler WTP PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> North Miami Beach, Florida 2007 2008 <br /> (3) BRIEF DESCRIPTION (Brief Scope, size, cost. etc.) AND SPECIFIC ROLE 0" Check if project perfonned with current finn <br />c. Architectural Designer / Project Manager responsible for the architectural design and constructions documents for all the architectural related aspects <br /> of the project. The project includes a large scale expansion and improvements to the existing water treatment plant that includes a new two story <br /> 14,500 sq ft administrative operations office building, a new 23,000 sq ft nanofiltration and reverse osmosis membrane technology building, in <br /> addition to support facilities such as high service pump rooms, motor control electrical rooms, generator rooms, a new 2,500 sq ft structure to hold <br /> sodium hypoclhorite tanks, meterinQ rooms and storaQe. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Walker Park Community Center & Library PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Hialeah, Florida 2007 2007 <br />d. (3) BRIEF DESCRIPTION (Brief Scope. size. cost. etc.) AND SPECIFIC ROLE 0" Check if project perfonned with current finn <br />Architectural Designer for the Walker Park Community Service Center and Library for the City of Hialeah. As part of their continuing services <br /> contract, the City of Hialeah commissioned C3TS to provide architecture and engineering design and construction for a 25,000 sq. ft. community <br /> center, library, daycare center, outdoor play areas and classrooms for adults and children alike. The vernacular design of this building and courtyard <br /> style will help create the image the City of Hialeah wishes to project and will increase the value of the surrounding properties. This project includes <br /> modifications of site desiQn to allow for future Qrowth of either soccer fields or baseball fields for the community and a possible fire/police station. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Renovation & Addition to Fairway Park PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Miramar, Florida <br />e. 0" Check if project perfonned with current finn <br /> (3) BRIEF DESCRIPTION (Brief Scope, size. cost. etc.) AND SPECIFIC ROLE <br /> Architectural Designer selected by the City of Miramar to design a 2,200 S.F. free standing building addition to an existing community center for the <br /> City of Miramar. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br /> <br />STANDARD FORM 330 (6/2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.