|
<br />.~
<br />
<br />-
<br />
<br />12, NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />
<br />ADOLFO J. COTILLA, JR., AlA
<br />15, FIRM NAME AND LOCATION (City and State)
<br />ACAI ASSOCIATES, INC., Fort Lauderdale, Florida
<br />19. RELEVANT PROJECTS
<br />
<br />Princioal in Charae
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL I b. WITH CURRENT FIRM
<br />
<br />31 25
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> US GENERAL SERVICES ADMINISTRATION AlE OPEN END CONTRACT PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> Florida Statewide 2007
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />e. ACAI Associates served under a 5 year (extended to 6 1/2 years) Open End, Indefinite Delivery/Indefinite Quantity Contract with
<br /> the GSA to provide unlimited Architectural/Engineering and Construction Management services. The work includes Courthouses
<br /> and Federal Buildings throughout the Southeast Florida region and was expanded to include Ocala and airports (for TSA).
<br /> Services provides include Architectural/Engineering, Interior Design, Historic Preservation, Planning, Programming, Structural
<br /> repairs and Construction Management.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> DISTRICT 4 AT LARGE PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> Florida Department of Transportation, District 4 2004
<br />f. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br /> As FOOT's Architect, ACAI worked in an Indefinite Quantity/Indefinite Delivery Contract for FOOT's District Four. ACAl's services
<br /> included a variety of projects, including Space Planning. Interior Renovations, Expansions, Value Engineering, Design &
<br /> Construction Administration. ACAI also provided Landscape Architecture support in the plan Review of District Four projects.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> NSU HPD CAMPUS AND AlE CONTINUING SERVICES CONTRACT PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> Various Campus Locations On-going
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />g. As Campus Architect, ACAI is currently providing services for renovation/repair projects, assessment reports, schematic planning,
<br /> and re-roofing projects throughout all of NSU's campuses. Projects include a $44M, 800,000 gsf medical campus complex in
<br /> Davie, Florida; $70M, 214,000 gsf research building in Davie, Florida; $2.1 M, 53,000 gsf interior fitout in Tampa, Florida, and
<br /> schematic planning for 64,800 gsf in West Palm Beach, Florida. Other projects are located at the North Miami Beach, Dania, Fort
<br /> Lauderdale, Orlando, Tampa, Jacksonville, Ft. Myers and Puerto Rico campuses.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> NSU ROOF ASSET MANAGEMENT PROGRAM PROFESSIONAL SERVICES1 CONSTRUCTION (if applicable)
<br /> Various Campus Locations On-qoinq
<br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br /> ACAI has been selected to provide Roofing Consultation Services for NOVA Southeastern University at all of its campuses
<br />h. throughout Florida. A major component includes a Roof Asset Management Program (RAMP). ACAl's responsibility is to provide
<br />the University with a program by which they can monitor the condition of all the roofs of owned properties and immediately
<br /> program required repairs. ACAI provides a Roof Abstract which provides a baseline of knowledge on each building roof and
<br /> establishes its conditions at the time of the visit. The RA includes a roof plan sketch, pictures of the building and provides a
<br /> general overview of the deck at a glance identifying the building and naming the roofing installer, the size and type of roof in place
<br /> and the status of the warranty in place. During the preparation of the RA, ACAI conducts the first semiannual inspection and
<br /> prepares a roof conditions report. ACAI then conducts semiannual visits. A report identifying noted concerns is then issued along
<br /> with a recommendation for roofinq repair work.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FlU ROOF ASSET MANAGEMENT PROGRAM PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> Miami, Florida On-aoina
<br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />i. ACAI has been selected to provide Roofing Consultation Services for Florida International University. A major component includes a Roof Asset
<br /> Management Program (RAMP). ACAI's responsibility is to provide the University a program by which they can monitor the condition of all the
<br /> roofs of owned properties. ACAI provides a Roof Abstract which provides a baseline of knowledge on each building roof and establishes its
<br /> conditions at the time of the visit. The RA includes a roof plan sketch, pictures of the building and provides a general overview of the deck at a
<br /> glance identifying the building and naming the roofing installer, the size and type of roof in place and the status of the warranty in place. During
<br /> the preparation of the RA, ACAI conducts the first semiannual inspection and prepares a roof conditions report.
<br />
<br />STANDARD FORM 330 (6/2004)
<br />
|