My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mc Harry Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
Mc Harry Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 2:01:12 PM
Creation date
11/10/2010 2:00:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Form 330 <br /> <br />RFQ 10-04-02 Professional Architectural Services <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />M.C. Harry & Associates, Inc. <br />21. TITLE AND LOCATION (City and State) <br />AlE Miscellaneous Services <br />General Services Administration <br />Miami Dade County <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />3 <br /> <br />22. YEAR COMPLETED 2008 <br />CONSTRUCTION (if applicabla) <br />Varies-projects <br />under $1 million <br /> <br />PROFESSIONAL SERVICES <br />Architecture <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Miami Dade County General Services <br />Administration <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />b. POINT OF CONTACT NAME <br />Alice Arguelles <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />786.469.5062 <br /> <br />Architectural and Engineering tasks for the Miami Dade County 11th Judicial Court System. <br />Implemented in multiple phases, the collection of projects have totaled $4 million in construction costs. <br />These projects where assigned as an individual tasks, and were required to remain operational through <br />the course of construction. Task assignments have included: <br /> <br />Studies for exterior restorations <br />Reprogramming <br />Interior renovations <br />Historical Restoration <br />Investigations <br />HV AC systems <br />Parking additions <br />Utilities Studies <br /> <br />Space panning <br />Upgrades studies <br />Exterior restorations <br />Courtroom Expansions <br />Fire Alarm Systems <br />ADA barrier removal <br />Life Safety Improvements <br /> <br /> <br />The historical restorations have received design awards: AlA Miami Award <br />of Excellence 2008 design award from AlA Miami 2009 awards from Florida <br />Trust for Historic Preservation and Dade Heritage Trust. <br />
The URL can be used to link to this page
Your browser does not support the video tag.